Object Design
312-
180 USD Two stages of framework
Object DesignDmitry Dmitry Anatolyovich
Engineer of Constructor.Execution of the project sections:
The construction of metal (KM)
Construction of metal particles (CMD)
… Architectural solutions (AR)
Construction of Iron Beton (KJ)
Visualization and animation of architecture;
-Digitalization and installation of schemes and scratches.#5ENGINEERS #CMD #CM #Production #Construction #Development_Design #Production #Top #Freelancehunt #Freelancer
#visualisation #visualization #Rendering #3d-visualization #metalloconstructions
The Crossing
Implementation of the project:
– #constructions_metallic (KM)
- #constructions_metallic detail (CMD)
– #architectural_resolution (AR)
– #constructions_Ironbetonny (KJ)
– Visualization of small and large architecture projects;
-Digitalization and restoration of drawings and schemes.#5ENGINEERS #CMD #CM #Production #construction #processing_chartes #projecting #podbor_seчения #top #freelancehunt #Freelancer
#visualisation #visualization #Rendering #3d-visualization #metalloconstructions
The Crossing
-
68 USD 3D model of knife
Object DesignCalculation and manufacture of the FOX ORESTE FRATI COMBAT JUNGLE FX-133MGT
-
45 USD the manipulator.
Object DesignThe development of a mechanical toy model, and the creation of a developed step-by-step instructions on assembly.
-
Schedule 3-1
Object Design
-
Schedule 2 – 1
Object Design
-
Specification of doors
Object Design
-
The third part
Object Design
-
338 USD The Chair_CM+CMD
Object DesignDesign of the metal frame of the roof coat size of 12x14 m with wearable networks on the windows in case of a coat explosion.
Duration of 15 working days.
The project is realised.
-
902 USD Lighting TRC_crossing KM+KMD
Object DesignDesign of lighting lighting with the exit of an elevator hall on the exploited TRC cover. Dimensions on the plan 24x35 m.Stock 20 working days. The project is realised.
-
113 USD Solar Panels
Object DesignThe essence of the work consisted in the development of a typical optimal economic and technological support structure for fixing solar panels for further serial production. Consider all the specifics of the design of ocinated metal constructions.
-
676 USD Industrial building (this) size 18x36 m_km
Object DesignDevelopment of the CM section of industrial building (Cech) for the production of building materials.
The development period is 20 working days.
The project is not realised.
-
338 USD Metal Construction Advertising_KM+KMD
Object DesignTo develop metal construction advertising from zero (divisions of KM+KMD).
Duration of 15 working days.
The project is realised.