Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
  • 180 USD

    Two stages of framework

    Object Design
    Dmitry Dmitry Anatolyovich
    Engineer of Constructor.Execution of the project sections:
    The construction of metal (KM)
    Construction of metal particles (CMD)
    Architectural solutions (AR)
    Construction of Iron Beton (KJ)
    Visualization and animation of architecture;
    -Digitalization and installation of schemes and scratches.#5ENGINEERS #CMD #CM #Production #Construction #Development_Design #Production #Top #Freelancehunt #Freelancer
    #visualisation #visualization #Rendering #3d-visualization #metalloconstructions
    The Crossing


    Implementation of the project:
    #constructions_metallic (KM)
    - #constructions_metallic detail (CMD)
    #architectural_resolution (AR)
    #constructions_Ironbetonny (KJ)
    – Visualization of small and large architecture projects;
    -Digitalization and restoration of drawings and schemes.#5ENGINEERS #CMD #CM #Production #construction #processing_chartes #projecting #podbor_seчения #top #freelancehunt #Freelancer
    #visualisation #visualization #Rendering #3d-visualization #metalloconstructions
    The Crossing


  • 68 USD

    3D model of knife

    Object Design
    Calculation and manufacture of the FOX ORESTE FRATI COMBAT JUNGLE FX-133MGT


  • 45 USD

    the manipulator.

    Object Design
    The development of a mechanical toy model, and the creation of a developed step-by-step instructions on assembly.


  • Schedule 3-1

    Object Design


  • Schedule 2 – 1

    Object Design


  • Specification of doors

    Object Design


  • The third part

    Object Design


  • 338 USD

    The Chair_CM+CMD

    Object Design
    Design of the metal frame of the roof coat size of 12x14 m with wearable networks on the windows in case of a coat explosion.
    Duration of 15 working days.
    The project is realised.


  • 902 USD

    Lighting TRC_crossing KM+KMD

    Object Design
    Design of lighting lighting with the exit of an elevator hall on the exploited TRC cover. Dimensions on the plan 24x35 m.Stock 20 working days. The project is realised.


  • 113 USD

    Solar Panels

    Object Design
    The essence of the work consisted in the development of a typical optimal economic and technological support structure for fixing solar panels for further serial production. Consider all the specifics of the design of ocinated metal constructions.


  • 676 USD

    Industrial building (this) size 18x36 m_km

    Object Design
    Development of the CM section of industrial building (Cech) for the production of building materials.
    The development period is 20 working days.
    The project is not realised.


  • 338 USD

    Metal Construction Advertising_KM+KMD

    Object Design
    To develop metal construction advertising from zero (divisions of KM+KMD).
    Duration of 15 working days.
    The project is realised.