Beach Nave with Flood Protection
Dmitry Dmitry Anatolyovich
Engineer since 2012.
Implementation of the project sections:
• Construction of metal (KM)
– Construction of metal details (CMD);
• Architectural solutions (AR)
• Construction of the building (KB);
- Visualization of small and large architectures;
-Digitalization and reproduction of scratches, schemes, sketches.
#5ENGINEERS #CMD #CM #Production #construction #processing_chartes #projecting #podbor_seчения #top #freelancehunt #Freelancer
#visualisation #visualization #Rendering #3d-visualization #metalloconstructions
The Crossing
Engineer since 2012.
Implementation of the project sections:
• Construction of metal (KM)
– Construction of metal details (CMD);
• Architectural solutions (AR)
• Construction of the building (KB);
- Visualization of small and large architectures;
-Digitalization and reproduction of scratches, schemes, sketches.
#5ENGINEERS #CMD #CM #Production #construction #processing_chartes #projecting #podbor_seчения #top #freelancehunt #Freelancer
#visualisation #visualization #Rendering #3d-visualization #metalloconstructions
The Crossing