Building of cleaning facilities, 2 floors, 24x12m

Object Design 359 USD
Job 17 of 19
The building of the mechanical dehydration of cleaning structures (24x12m) in Zelenodolsk Dnepropetrovsk region. The new construction. Sections of CM and AS. Steel frame - columns, cover and cover balls, farm cover, cran balls. Walls and roof sandwich panels. Percussion - collective empty plates on steel balls. Foundations under columns are monolithic columns. Basic balls g/b under sandwich panels. The duration of the project is 20 days.
Details
  • Added:
474

Freelancer

  • Projects -
  • Rating -
  • Rating 529
Register

If you have an account, log in

Indicators

  • Bids in the last two weeks: 2
  • Last visit: 7 days 20 hours ago