Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
The visualization of the park with the elements of the columns of the roof and the heated structure is used with a profile.
Dmitry Dmitry Anatolyovich
Engineer of Constructor.
Execution of the project sections:
The construction of metal (KM)
Construction of metal particles (CMD)
Architectural solutions (AR)
Construction of Iron Beton (KJ)
Visualization and animation of architecture;
-Digitalization and installation of schemes and scratches.


#5ENGINEERS #CMD #CM #Production #Construction #Development_Design #Production #Top #Freelancehunt #Freelancer
#visualisation #visualization #Rendering #3d-visualization #metalloconstructions
The Crossing
Work details
Budget 8 USD
Added 15 May 2019
858 views

2 likes
Freelancer
Dmitro Vasilenko
Ukraine Poltava  66  1

Available for hire Available for hire
66 Safes completed
3 arbitrations
On the service 10 years