Capture of the generator 500 kVA

Engineering 67 USD
Job 1 of 5
Development and manufacture of capot generator power. The work is done at #Solidworks. The #3d model was agreed with the customer, the work #charts were built and the product was manufactured. From the start of the design to the start of production, 5 working days have passed.