Landing equipment for water removal

Website Development 58 USD
Job 40 of 55
It was needed to be a bandwidth, according to the TZ and the prototype of the orderer.
- Additionally to the skin element add a pop with characteristics.
- Connect the form of the reversal connection
The work was performed, at the end of the project the orderman re-thinked and the line was not transferred to the hosting, frozen to an unfinished term.
Details
323

Freelancer

  • Projects 43
  • Rating -
  • Rating 2 595
Register

If you have an account, log in

Indicators

  • Last project: 2 years back
  • Collaboration with clients: 30
  • Last visit: 8 months 6 days ago