Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
This project is designed as an integrated system — from idea to detailed design.

The metal frame of the building is not just a structure. It is the foundation that determines reliability, construction speed, and operational efficiency. In this project, we have worked through the complete cycle: KM, KMD, and key nodes — taking into account real assembly.

Each solution is not "on paper," but with an understanding of how it will be assembled on the construction site.

thought-out scheme of load-bearing structures
precise detailing of nodes
optimization of materials and budget
readiness for production and quick assembly

We are developing not just drawings —
we are creating solutions that can actually be built.

Architecture + design = a result that works.
Work details
Added 5 May
53 views
Freelancer
Dmytro Zaliznyuk
Ukraine Kyiv
No reviews

Available for hire Available for hire
On the service 30 days 3 hours