Project of OVC (HVAC) Medical Center Systems
A project (stage R) of ventilation, air conditioning and heating systems for the family-type Medical Center with birth halls, pre-born and post-born halls has been developed.
The center is located in a separate four-storey building.
The project documentation is developed, guided by the modern requirements operating on the territory of Ukraine by construction, fire, sanitary and hygiene, environmental and other norms (SNIP, DBN, GOST).
The work project is carried out in professional computer programs (“AutoCAD”, “MagiCAD” etc.). It includes: an explanatory note; a list of general data; plans, cuts, types of construction structures and engineering systems, acsonometric and visual schemes of air conditioning, ventilation and heating systems, drawings of fixing equipment details. specifications of equipment and consumption materials, etc.
The center is located in a separate four-storey building.
The project documentation is developed, guided by the modern requirements operating on the territory of Ukraine by construction, fire, sanitary and hygiene, environmental and other norms (SNIP, DBN, GOST).
The work project is carried out in professional computer programs (“AutoCAD”, “MagiCAD” etc.). It includes: an explanatory note; a list of general data; plans, cuts, types of construction structures and engineering systems, acsonometric and visual schemes of air conditioning, ventilation and heating systems, drawings of fixing equipment details. specifications of equipment and consumption materials, etc.