Project of reconstruction of the existing roof (4000m2)
Construction of the existing blood.
Additional blood throwing of the old.
The work is done, the roof is ready.
Work is completed:
Choosing the optimal solution;
• Blood design;
- Composition of the full specification of materials;
- control of the order and delivery of materials to the object;
The head of assembly.
Additional blood throwing of the old.
The work is done, the roof is ready.
Work is completed:
Choosing the optimal solution;
• Blood design;
- Composition of the full specification of materials;
- control of the order and delivery of materials to the object;
The head of assembly.