Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
A building building with underground parking has been developed. The structure of the project: AR, AB, GP, PZ, VK, OV, ETR, ZVK, GPZ, GPV, OVNS. The object is entered into operation.
Work details
Added 25 December 2018
308 views

1 like
Freelancer
Oleksandr Mamchur
Ukraine Dnepr  1  0

Available for hire Available for hire
1 Safe completed
On the service 7 years