Decoration and Improvement of Construction

Engineering
Job 11 of 62
The problem is the aluminum cover, a huge uncontrolled breakdown of the entire structure. It was necessary to make the design harder without changing its overall appearance. The calculation was made in Ansys. The contractor is given a scheme of improvement of the structure.
Details
  • Added:
802

Freelancer

  • Projects 91
  • Rating 5.0
  • Rating 6 541
Register

If you have an account, log in

Indicators

  • Last project: 7 hours back
  • Bids in the last two weeks: 5
  • Collaboration with clients: 56
  • Last visit: 2 hours 22 seconds ago
  • Replies within 3 hours