The site is developed on wordpress and integrated with crm of Israeli origin for the collection of applications.
The development deadlines were very compressed.
The site was made in 3 days.
It was done in 2.5 days. (H without sleep worked with the designer)
The development deadlines were very compressed.
The site was made in 3 days.
It was done in 2.5 days. (H without sleep worked with the designer)