Chronology of events:
1) The project was taken into operation in the middle of February 2018.The following work was carried out in February and March:
the audit;
Analysis of competitors in the niche;
- prepared TZ for the programming to eliminate technical errors;
optimization of meta-categories, tags;
to the copywriter.3) From April to July 2018 - SEO-progress of the project, during this period was done:
optimized content on commercial landing pages;
Add information articles to the blog (5-6 articles per month)
Purchase of links (8-10 pieces per month)
Crowd-Marketing (15-20 links per month)
Working with Social Factors
Working with Google Maps
4) In July 2018 the work on the project was stopped.After July 2018, no more works were carried out, no links were purchased, no articles were posted.The result:
In 4.5 months, optimization work and increased link mass were carried out, which later gave a result in increased organic traffic.Organic traffic increased from 240 sessions per month to 2450 sessions per month.View the full case here: https://drive.google.com/file/d/1vu-deQbBXTDQ-jljmL4TlyrFLvn4YcSx/view?usp=sharing
Topic: Polygraphic Services
Region: Kiev, Ukraine
Period of work: February-July 2018
Chronology of events:
1) The project was taken into operation in the middle of February 2018.The following work was carried out in February and March:
the audit;
Analysis of competitors in the niche;
- prepared TZ for the programming to eliminate technical errors;
optimization of meta-categories, tags;
to the copywriter.3) From April to July 2018 - SEO-progress of the project, during this period was done:
optimized content on commercial landing pages;
Add information articles to the blog (5-6 articles per month)
Purchase of links (8-10 pieces per month)
Crowd-Marketing (15-20 links per month)
Working with Social Factors
Working with Google Maps
4) In July 2018 the work on the project was stopped.After July 2018, no more works were carried out, no links were purchased, no articles were posted.The result:
In 4.5 months, optimization work and increased link mass were carried out, which later gave a result in increased organic traffic.Organic traffic increased from 240 sessions per month to 2450 sessions per month.View the full case here: https://drive.google.com/file/d/1vu-deQbBXTDQ-jljmL4TlyrFLvn4YcSx/view?usp=sharing