Website design (hotel business)
The task of the project: it was necessary to develop the structure of a multi-page site for the hotel with the possibility of booking, create the design and adapt the phone and tablet.
Term of execution: 15 days
Procedures that have been carried out:
Analysis of competitors and competitors;
Copy of the site;
the prototyping;
Design of all pages;
Adaptation of the design of the phone and tablet;
Preparation of packages to the edge.
Term of execution: 15 days
Procedures that have been carried out:
Analysis of competitors and competitors;
Copy of the site;
the prototyping;
Design of all pages;
Adaptation of the design of the phone and tablet;
Preparation of packages to the edge.