Yurii Buhaiov
Reviews of completed projects 2
27 May
406 USD
Boiler ETR 80
Everything is fine. It's very pleasant to work with the client.
![]()
26 May
451 USD
Project of electric lighting of the boiler 170 kcal
I was satisfied with the collaboration.
The client was always in touch, tasks were set clearly and understandably, which is very important when developing project documentation and implementing technical solutions for industrial facilities.
The project provided initial data, examples, and necessary information for work, which made the design process comfortable and constructive.
Payment was timely, and the requirements were adequate and justified. I recommend collaborating.
Activity
| Latest published projects |
Budget
|
Proposals
|
Comments
|
Open
|
|
|---|---|---|---|---|---|
|
Boiler 80 video surveillance system. Only plans, specifications, connection diagram.
180 USD
|
22
May
|
||||
|
ETR, boiler 17
451 USD
|
21
May
|
||||
|
ETR, boiler 17
451 USD
|
21
May
|
||||
|
ETR, boiler 17
451 USD
|
21
May
|
||||
|
Boiler ETR 80
406 USD
|
20
May
|
||||
|
Working project, section of the boiler ETR 80. 0.4 kV and 3 kV. The volumes are small.
406 USD
|
12
May
|
||||
|
Working project section of the ETR boiler 170 0.4 kV and 3 kV. The volumes are small.
451 USD
|
12
May
|
||||
|
Designing a complete set of the Troika and Dismet project
451 USD
|
12
May
|
||||
|
Project of electric lighting of the boiler 170 kcal
451 USD
|
3
May
|
||||
|
Project of electric lighting of the boiler 80 Gcal
451 USD
|
3
May
|