Yurii Buhaiov
Reviews of completed projects 3
20 June
223 USD
Line for feeding two components through dosing pumps.
Interesting and fruitful collaboration. The payment is decent.
27 May
401 USD
Boiler ETR 80
Everything is fine. It's very pleasant to work with the client.
![]()
26 May
445 USD
Project of electric lighting of the boiler 170 kcal
I was satisfied with the collaboration.
The client was always in touch, tasks were set clearly and understandably, which is very important when developing project documentation and implementing technical solutions for industrial facilities.
The project provided initial data, examples, and necessary information for work, which made the design process comfortable and constructive.
Payment was timely, and the requirements were adequate and justified. I recommend collaborating.
Activity
| Latest published projects |
Budget
|
Proposals
|
Comments
|
Open
|
|
|---|---|---|---|---|---|
|
Line for feeding two components through dosing pumps.
223 USD
|
10
Jun
|
||||
|
Boiler 80 video surveillance system. Only plans, specifications, connection diagram.
178 USD
|
22
May
|
||||
|
ETR, boiler 17
445 USD
|
21
May
|
||||
|
ETR, boiler 17
445 USD
|
21
May
|
||||
|
ETR, boiler 17
445 USD
|
21
May
|
||||
|
Boiler ETR 80
401 USD
|
20
May
|
||||
|
Working project, section of the boiler ETR 80. 0.4 kV and 3 kV. The volumes are small.
401 USD
|
12
May
|
||||
|
Working project section of the ETR boiler 170 0.4 kV and 3 kV. The volumes are small.
445 USD
|
12
May
|
||||
|
Designing a complete set of the Troika and Dismet project
445 USD
|
12
May
|
||||
|
Project of electric lighting of the boiler 170 kcal
445 USD
|
3
May
|