Oleksii S
Reviews of completed projects 4
29 January
22 USD
Development of CAD, 3D and drawings of PVC patches
A combination of factors (personal and external) contributed to the increase in the time taken to complete the project. I acknowledge my own fault.
![]()
8 January
45 USD
Development of fastening technology (CAD, drawing, stl)
Interesting project. The initial models were created by another contractor and did not represent a CAD model. Through joint efforts, we completed the necessary volume of work - designed the fasteners and created the corresponding 3D models for further production. I am satisfied with the collaboration and recommend the client.
![]()
19 November 2025
33 USD
Replacement of the mounting on the platform and creation of a 3D model in two variations.
Olexiy provided a clear technical assignment and was always in touch, the collaboration was satisfactory.
![]()
3 August 2025
89 USD
Platform with patch attachment + patch
Satisfied with the collaboration, the client provided a clear technical task and was always in touch
![]()
Activity
| Latest published projects |
Budget
|
Proposals
|
Comments
|
Open
|
|
|---|---|---|---|---|---|
|
Development of CAD, 3D and drawings of PVC patches
22 USD
|
8
Jan
|
||||
|
Development of fastening technology (CAD, drawing, stl)
45 USD
|
7
Jan
|
||||
|
Replacement of the mounting on the platform and creation of a 3D model in two variations.
33 USD
|
Nov
2025
|
||||
|
Platform with patch attachment + patch
89 USD
|
Jul
2025
|
||||
|
Development and Implementation of a Marketing Strategy
|
Aug
2024
|
||||
|
Development and implementation of a marketing strategy
|
Aug
2024
|