Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak

Dmitro Leschenko

Sleeping face
Dmitro hasn't been on the service for a long time.
But on Freelancehunt, there are also 569 freelancers in category Engineering, who will professionally and timely complete a project of any complexity.

Ukraine Kyiv, Ukraine
2 years back
Available for hire available for hire
age 28 years
on the service 2 years
  • hvac

Rating

Successful projects
No data
Average rating
No data
Rating
39

Language proficiency level

Українська Українська: fluent
English English: pre-intermediate

Skills and abilities

Portfolio


  • 446 USD

    The refrigeration point of the food industry

    Engineering
    A cooling point for the food industry has been developed with the receipt of a low-temperature carrier from the plant’s highways and the installation of a heat exchanger to increase the temperature of the cold carrier and to distribute it by consumers.
  • 893 USD

    Supporting temperature and wind mode in the pipeline facilities

    Engineering
    In this project was carried out the calculation of heat losses and heat flows of the premises, according to which it was proposed to establish the recirculation system of ventilation with air drying. In the field of harmful emissions, the flow-output system with heat recovery has been used to reduce the energy costs of the room, as well as the local output systems have been developed for harmful emissions from the installed equipment. To facilitate the possibility of carrying out the collection, a solution is proposed with the installation of tissue flowing windroads. The examination of the existing ventilation system has also been carried out and the proposed measures are taken to restore its functionality.
  • 335 USD

    Development of the 6 Chiller Connection Scheme

    Drawings & Diagrams
    In this work, a principle scheme was developed to connect new 6 chillers to the existing system of heat supply and cooling of the cultural and urban center. All the necessary equipment and equipment were pressed to allow the heat/cold chiller to be used independently of each other.
  • 781 USD

    Development of ventilation and heating systems

    Engineering
    In this work was performed the calculation of the heat loss of the bottle taking into account the heating of the boiling structures and losses on the ventilation of the rooms. According to the calculation, steel panel radiators were selected and pipelines were calculated according to the necessary cost of thermal transport and its speed. In the premises of the sandwiches, the sports hall, the dining hall and the manufacturing rooms of the kitchen were designed mechanical ventilation systems according to the current norms and technological task. This work was performed in the form of a 3D model in the AUTODESK REVIT program.