Sergey Litvinov
Offer Sergey work on your next project.
Rating
Skills and abilities
Architecture
Portfolio
-
Fundamentals of grain storage
EngineeringDesign of the foundations of the grain storage complex
Year of documentation - 2008
Summary sheet - 1200 sheets attached to format A4
Total time of development of constructive sections (KG) - 5.0 calendar months
-
Foundations under the power capacity (pump)
Engineering -
Foundations under force capacity (armament)
Engineering -
Armatural frame and ground details
Engineering -
The concept of the frame of the building (Figure 1)
Object DesignRestaurant with 600 seats
Year of documentation - 2014
The developed sections:
CR1, constructive solutions (project composition, TEP)
… - CR2, constructive solutions (conscious knowledge of the need for basic construction materials)
AR, architectural solutions
- AS, architectural - construction solutions (construction of the ground part)
- KJ, iron concrete structures (found construction)
- KJ1, iron concrete structures (construction of overcoll cover)
CM, metallic structures
Summary sheet - 700 sheets attached to format A4
Introduction - in the construction process
Total area without reducing coefficients - 1600.0 m2
Total area with decreasing coefficients - 1400.0 mq.
Area of construction - 1320.0 m2
The size of the spot of the building inserted in a straight corner - 46.0 x 36.5 m
Total time for the development of project documentation - 2.5 calendar months
-
The concept of the frame of the building (Figure 2)
Object Design -
Scheme of Sweat Field
Object Design -
by EP. List of 1. General data
Architectural DesignIndividual Household
Construction area - Moscow region
Year of documentation - 2013
The developed sections:
… EP, a sketch project
- KJ, iron concrete structures (found construction)
- AS, architectural - construction solutions (construction of the ground part)
Introduction to operation - 2015 (the second quarter )
Summary sheet - 102 sheets, format A3
The total area without reducing coefficients is 519.0 mq.
The total area with decreasing coefficients is 392.0 m2.
Area of construction - 228.0 m2
The size of the spot of the house inserted in the straight corner - 20.88 x 15.60 m
Sum time for the development of the sketch project (EP) - 2.0 calendar weeks (at the time for agreement)
Total time for the development of structural sections (AS, KJ) - 1.0 calendar month
-
by EP. List of 4. Perspective (Light performance)
Architectural Design -
by EP. List of 5. Perspective 2 (Light performance)
Architectural Design -
by EP. List of 6. Perspective 3 (the dark performance)
Architectural Design -
by EP. List of 8. Facade 1-4 (light performance)
Architectural Design -
by EP. List of 16. Plan of the first floor (concept)
Architectural Design -
by EP. List of 17. Plan of the first floor.
Architectural Design -
by KJ. List of 1. General data
Architectural Design
Activity
| Latest proposals 4 | Budget | Added | Deadlines | Proposal | |
|---|---|---|---|---|---|
|
Работа инженер-чертежник в дизайн-студию New House ,в г.Николаев.
23 USD
|
|||||
|
Свайный фундамент
77 USD
|
|||||
|
Проектирование индивидуальных жилых домов (коттеджей)
0 USD
|
|||||
|
Проект технологічний кухні кафе-піцерії
79 USD
|