Maksim Guzovich
Rating
Skills and abilities
Architecture
-
Drawings & Diagrams
from 2 USD for unit
-
Engineering
from 13 USD for project
-
Object Design
from 13 USD for project
Writing
-
Articles & Blog Posts
from 11 USD for article
Portfolio
-
153 USD SCC Project for Children's Garden
EngineeringIn accordance with the design task, the project provides:
- Organization of staff RM (workplaces) through the creation of SKS (Structured Cable System) on the 1st and 2nd floor of the building body
LVS (Local Computing Network) on the Basic Server
Organization of telephone IP network and communication channels with the operator
… The communication organization scheme is developed taking into account interchangeability, simplicity of operation and the ability to scale the system and enhance the services.Local computing networks are developed on the basis of the server solution from "STSS" Flagman RX120.5-004LF and the MES2124M "Electronic Communications" switch, installed in room No. 202.1 equipped under a server on the 2nd floor of the designed building.For the output on the common network (OP) is provided for the organization of the 1st channel of data transmission through the interface 100/1000 Base-X connected through the optical channel.The SSC network includes:
- a workplace subsystem equipped with two RJ45 ports of category 5e, with 9 RM on the first floor and 14 RM on the second floor;
- ports for connecting office equipment and TVs;
- Ports for the extract of data from the building engineering systems.
-
122 USD Project of Children's Garden Radio
EngineeringTo ensure the connection to the radio network, the project provides for:
- installation on the roof of the building of radio resistant RS-I-0,8 with traversa;
- installation of the subscriber TAMU-10 reducing transformator on the pipeline;
- placement of the distribution and subscription network of broadcasting via the Loutox21ng(A)-FRLSLTx 1x2x1,5 cable;
… - installation of boxes of responsible UC-2P, restrictive UC-2P on the floors openly or behind the ceiling;
- installation of radio broadcast RPV-2 rows for hidden conducts with subscribers Neiva AG-306 speakers in the rooms.The number of installed radio points is 11 pieces.In accordance with SP133.13330.2012 and SP134.13330.2012 the installation of radio points in the rooms for group works - one radio point for each room with a permanent or episodic residence of the staff.In the room 202.1 server is provided for the installation of the lighting box of UC-2P to send the signal of the alarm system to the system of the SOA (foreseen by a separate project).Limit and discharge boxes should not be installed over the windows and doors.The place of installation of the RPV-2 subscribers is specified in the process of construction and assembly works, but should not be located further 1 m from the 220V rocket.If possible, the RPV-2 subscribers are installed at the same height with the RPV 220V.When passing the lines through the capital walls and the inner peripherals, to protect the placed cable lines and to prevent the spread of fire in the event of an emergency, use gils from the cuts of the 20mm steel pipes.In order to comply with the fire safety rules, the hole must be hermetized with a fire-resistant polyurethane pen with a limit of fire-resistance not less than the fire-resistance of the construction structure.
-
100 USD Internal Networks for the Berislav CGB
EngineeringThe project of the electrical network of the block B of the hospital is carried out on the basis of:
The nominal voltage of the electrical networks ~380/220 V, a system with deep ground neutrality.The power supply is provided with a voltage of ~380V.Electricity supply source TP-10/0.4kV that is designed.The power plant of the hospital is completed by designed cable lines CL-0.4kV placed in the ground from RU-0.4kV TP-10/0.4kV to the AVR shields installed in the underground in the electric shield.The emergency source of electricity supply is the existing diesel-generator with power Sn=75kW feed consumers I category of electricity supply, switching is made using the AVR installed in the room of electricity shield.The compensation of the reactive power is performed by the automatic condensator installations of the type AKU-0.4-15 2x(0.4/15quar) installed in the electric shield.The project provides work, emergency, emergency and evacuation lighting of the premises with a voltage of ~220V.For emergency lighting and "output" indicators, lamps with built-in battery are used.The norms of lighting are selected according to DBN B.2.5-28-2006 p.Group electric networks performed hidden with a cable with copper wire in PVC isolation with a low-smoke and low-smoke protective non-smoke coating and gas emission type VWG-P.On the walls the cable is placed hidden under a rubber, on the roof in the empty plates of cover, behind the shed roof in a gofrot tube of non-rushed plastic.The project provides a protective landing on the existing landing contour and the attachment to it of the main landing tyres using two 40x4mm steel stripes.The main landing tyre shall be placed on the entrance inside the input and distribution shields of the VRU-1, SHVA-1.Landing system of TN-C-S.Measures have been taken to ensure that people are protected from damage by electric current, both in the absence of damage in the electrical installation and in the presence of it.As an additional measure of protection for roset groups, a protective disconnection device is installed.
-
56 USD Division of external networks of 0.4 kV for Berislavskaya CGB
Engineering
The electricity supply of the consumers of the obstetric and gynecological, adjustable block "B" and the existing block "A" is performed with a voltage of 0.4kV.The basic and reserve power supply of the block "B" is performed by two cable lines, KL1 and KL2, with a armored cable of the type ABBSHV 3x150+1x70mm2, placed from the I and II section of the tyres of the adjustable TP 10/0,4kV to the projected input device AVR-1.Additionally, to provide consumers with the electricity supply category I of block "B" (operational, family chambers, etc.The project provides for the construction of the CL-3, carried out by the ABBSHV 3x50+1x25mm2 cable from the existing diesel generator installation Snom=75 kVA cosφ=0,85, Rnom=63,75 kWh to the projected AVR-2 shield.To connect the line in the generator room install the automatic switch type VA 88-32, IOM=80A in the designed shuttle type SHMP 4-0-36.The block "A" KL-4 power supply reserve line is carried out by the ABBSHV 3x95 + 1x50mm2 type cable from the I section of the tyres of 10/0,4kV to the existing SCHVR block input device.The cable of the projected electricity supply lines to be placed in the ground on the ground.-0.7m, when passing under the road to perform the deepening of the cable at -1.0m.Crossing with engineering communications to be performed in butterflies from the Dussl = 110mm PE tube.The placement of inter-reserved cables in one transchee to be performed at a distance of 0.5 m from each other, while to protect the neighboring cables in case of short lock in one of the lines as parallel tracking between them is placed a rubber.Over the entire track over the cable is placed a signal tape with the inscription "Beware of the cable 0.4kV", the tape is placed 300mm above the cable.The armor and the REN of the cable power supply lines are landed on the landing devices of RU 0.4kV designed TP 10/0,4 and the electric shield block "B".
-
112 USD Electricity supply and reconstruction project 10/0,4
EngineeringProject for the electricity supply of the reconstructed infectious department for adults
Networks 10kW
Category of reliability of electricity - II;
Source of electricity:
… The main food - F-1001 PL-10kV Ic.sh.PS-35/10kv “Zaria”;
Reserve food - f-1003 PL-10kV Ic.sh.PS-35/10kw “Zaria”Point of accession:
Main food - on the linear pipeline pressure on the support No. 1 of the pipeline on ZTP 10/0.4kV No. 32 PL-10kV, f-1001 PS35/10kV "Zaria"
Reserve food - linear pipeline pressure on support No. 7a additional installable in the creation of support No. 7 PL-10kV f-1003 pipes on R31k PS-35/10kV "Zaria" and support No. 2 VL-10kV f-1001 pipes on R-31k PS-35/10kV "Zaria"
For the connection of the capacities of the Gynecological and Gynecological department of the building of Berislavskaya CRB, the project provides:
1 .Upgrading TP 10/0,4kV according to the typical project 407-3-352..84 Transformer substation with four air input 6-10kV on two transformers with a power of up to 2x400kVA, which was developed by the Ivanovsky department of the Institute of Hypercommunications in 1984.2ndConstruction of VL-10kV of basic power carried out by the AC 50 wiring, from linear pushes of support No. 1 to the ZTP 10/0.4kV No. 32, to the input device installed on the facade of the projected TP 10/0,4.with the installation of the UOP response device on the existing support No. 1 and the separator on the projected support No. 1a;
ThreeInstallation of support 7a by type UA10-1 in the creation of support No7 and No2 VL-10kV, F-1003;
4 .Construction of VL-10kV of reserve power performed by the AC 50 cable, from the separator cement installed on the projected support 7a to the input device on the facade of the projected TP 10/0,4.Landing TP 10/0,4kV to be performed on the projected conturb of landing with a rotating resistance not more than 4 Ohm.Also landing is subject to the armature of support designed VL-10 kW and installed on the support separators.Landing equipment and its accession to the potential equation system to be performed in accordance with the requirements of the PUE
-
78 USD Project of fire signaling and notification of the APS, CO
EngineeringThe project of fire signaling and evacuation control system according to the vibrations of the DBN V.2.5-56:2014 and the current standards.In the projected premises of the office and trade building, the project predicts the installation of the unreserved automatic system of fire signaling (AUPS) and the system of deforestation and evacuation management (SUAE).The fire signaling device is used by the "Tiras-16P" pristry, which has technical possibilities for the detection of the primary signs of fire, is capable of processing and providing, in the given form, the warning of fire, forming commands for the handling of the warning systems, fire gasing, etc.For the early detection of the fire or its sign, this project provides for the use of smoke spyware "SPD-3.2", thermal "SPT-2B" and manual SPR-1.The fire signal slides are radial, performed with a 4x0,5mm PSVEVG cable.Before the PCP, the cables were introduced to disconnect the ventilation, transfer the elevator to the "fire" mode, as well as activation of the electrosuction of the fireproof waterway.For these purposes, a fire-stable cable type FRHF FE180/E30-90 2x1,0mm2 is used with a fire-stable range of 90 minutes.System of fire warning CO-2.The project predicts the installation of a light-sound lighting output OPOC-4, on the facade of the building, the light-sound lighting "Fire" (OSZ) in the premises, light indicators with the inscription "Vihod" (OS1 ), placed on the roofs of evacuation from the building.It is also provided for the transmission of the signal (fire/unfairness etc.)through the mobile network, to the district dispatch pult of the State Fire Guard according to the previously agreed protocol, the transmission is performed using the MCA-gsm module installed at the PCC.#fire #signalization #project #fire #signalization #signalization
Activity
| Latest proposals 6 | Budget | Added | Deadlines | Proposal | |
|---|---|---|---|---|---|
|
Freelance project
102 USD
|
|||||
|
Руководитель отдела учителей онлайн школы
401 USD
|
|||||
|
Пожарная сигнализация
4 USD
|
|||||
|
Проект ЭОМ
184 USD
|
|||||
|
Проектування мереж зовнішнього освітлення
78 USD
|
|||||
|
Проект инженерный (отопление, канализация, вентиляция, электрика)
51 USD
|