Toughened Laminated Safety
Calculation and drawings of the redductor are completed. Calculation and drawing of the bubble. Construction of a drainage scheme
|
Project
|
Type | Budget | Proposal | Deadline | Added |
|---|---|---|---|---|---|
| Not specified |
22 USD
|
10 days | 5 Aug 2019 |