Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak

Taras Darmoroz

Offer Taras work on your next project.

Ukraine Lvov, Ukraine
5 months 28 days back
Temporarily not working temporarily not working
on the service 7 years

    Rating

    Successful projects
    No data
    Average rating
    No data
    Rating
    231
    Object Design
    129 place out of 354
    Drawings & Diagrams
    175 place out of 707

    Skills and abilities

    Architecture

    Portfolio


    • 1804 USD

      Cover of the pool

      Object Design
      Development of cutting KM and KMD structures covering 25-metre pool sizes on a plan of 30x34 m. The total weight is 50 tons.
      Execution time is 60 kD. The project is realised.
    • 1579 USD

      The supermarket. Project (CM Division) + development of the CMD

      Object Design
      Calculation of the frame and design, issuing the CM set, further detailing and issuing the CM set (970 details, 370 marks, 61 t).
      Duration of development of the section of KM - 20 rd, KMD - 25 rd. The project is realised.
    • 789 USD

      The garage - KMD

      Object Design
      The development of the package of cracks of the KMD industrial building (master room with garage).
      Total mass of 50 t.
      Duration of 30 k.d.
      The project is realised.
    • 677 USD

      Navis and transition gallery_KMD

      Object Design
      Crossing of the CMD nausea and transitional gallery. 32 T, 25 working days. The project is realised.
    • 226 USD

      A view of the military part. The KMD

      Object Design
      The development of the KMD’s review base of the military part. Division of KMD. Duration of 10 days. The project is realised.
    • 338 USD

      The Chair_CM+CMD

      Object Design
      Design of the metal frame of the roof coat size of 12x14 m with wearable networks on the windows in case of a coat explosion.
      Duration of 15 working days.
      The project is realised.
    • 902 USD

      Lighting TRC_crossing KM+KMD

      Object Design
      Design of lighting lighting with the exit of an elevator hall on the exploited TRC cover. Dimensions on the plan 24x35 m.Stock 20 working days. The project is realised.
    • 113 USD

      Solar Panels

      Object Design
      The essence of the work consisted in the development of a typical optimal economic and technological support structure for fixing solar panels for further serial production. Consider all the specifics of the design of ocinated metal constructions.
    • 338 USD

      Metal Construction Advertising_KM+KMD

      Object Design
      To develop metal construction advertising from zero (divisions of KM+KMD).
      Duration of 15 working days.
      The project is realised.
    • 677 USD

      Industrial building (this) size 18x36 m_km

      Object Design
      Development of the CM section of industrial building (Cech) for the production of building materials.
      The development period is 20 working days.
      The project is not realised.

    Activity

      Latest proposals 5
    Design of the KM/KZ section Personal project
    609 USD
    Проект для виготовлення та монтажу металокаркаса під склад
    23 USD
    Технические перевод (русский->английский). Чертежи металл, бетон, техн
    45 USD
    Проектування бункера зберігання золи та транспортера
    23 USD
    Разработка разделов КЖ, КМ, КМД.
    23 USD