Mar'yan K.
Rating
Skills and abilities
Design & art
Architecture
-
Architectural Design
from 22 USD for project
-
Drawings & Diagrams
from 33 USD for project
-
Engineering
from 22 USD for project
-
Object Design
from 35 USD for project
Portfolio
-
2500 USD Cutting machine
Drawings & DiagramsDevelopment of a 3D model and drawing for manufacturing. Intended for processing wood processing and sawmill waste into technological and fuel chips, or wood mass for briquetting. Drum-type machine with mechanical feeding of raw materials into the cutting zone.
-
401 USD Cushion for BIG-BEG
Drawings & DiagramsBIG BEG - 2 m3 is a specialized new equipment, designed to fill with smooth materials of soft fascial containers. Such a kitch can perform the functions of two types of equipment at the same time - a loading kitch and a stationary doser. Cows for the Big-Beg are actively applied in the agriculture. Carrying grains in Big-Beg now does not take a lot of time, process management is carried out from the carrier cabin.
-
400 USD Molecular Dryer
Drawings & DiagramsMolecular Dryer
Capacity 55 kW
-
500 USD container multi-lift
EngineeringUniversal container, which is suitable for the collection and further export of snow, sand, metal waste, building waste, industrial waste, etc. The size of the container is also easy to use when recycling large-scale waste. Compact sizes, thanks to which the container occupies a small area, and it can be installed for a long time in the conditions of a thick construction.
-
400 USD Design of Console Crane
EngineeringCalculation and design of a 500kg console crane with a 4m shot.
-
1200 USD HPU 110kW
EngineeringDevelopment of a 110kW hydro station with a hydraulic side volume of 1200l.
-
143 USD Load for 2m3
Drawings & Diagrams2.7 m3 chargers are compatible with JCB, Manitou, Dieci chargers. It is used to perform a wide range of tasks. It is applied to: load and discharge of various materials, such as soil, sand, stone.
-
500 USD Composition of Hydroshema
EngineeringComposition of the basic hydro-scheme for the work of boring equipment.
-
111 USD The KD press form
Drawings & DiagramsPreparation of construction documentation for the preparation of press-forms on the plaque
-
67 USD The Cube 2
Engineering -
120 USD The closet in the living room
Drawings & DiagramsDesign of a closet for cutting and cutting for assembly
-
600 USD The Asenizator
Drawings & DiagramsDesign of detailed decorations of production
-
67 USD The Coupé
EngineeringDesign of the Coupé
-
500 USD Project of the tanks
EngineeringTank clothes for burn solution
-
67 USD Hydrocylinders
Engineering
Development of hydrocylinders
Reviews and compliments on completed projects 24
7 May
67 USD
Detail of the dispenser
Everything is great. We plan to collaborate further!
![]()
8 January 2024
78 USD
The door
Everything was done properly and timely. I recommend it.
![]()
16 November 2023
145 USD
Акумуляторний ящик
People understand what they are doing and what they are doing.
The project is done in time and quality!
I recommend it as a reliable and experienced executive!
![]()
14 November 2023
100 USD
Spraying equipment
Everything was done timely and responsibly. I recommend
![]()
22 August 2023
65 USD
Crossing on a transporter
Everything was done in the specified time.
![]()
19 July 2023
60 USD
The Pride
I performed timely and well.
![]()
6 July 2023
123 USD
Firewalls
The officer did the task timely and responsibly. RAZU
![]()
9 June 2023
45 USD
The Ice
The manager has done the job as well as always.
![]()
21 March 2023
67 USD
The door p. Dp2 ch.0008-113-328-11-1-KM
Very pleasant to collaborate with the executive.
![]()
20 March 2023
18 USD
Mango is 3mm
As always, everything is fine. Thank you for cooperation
![]()
1 March 2023
49 USD
Mongolians dissolved
Fast and quality. Thank you for cooperation
![]()
20 February 2023
21 USD
Manhattan baggage
The project is implemented. Everything in time.
16 February 2023
67 USD
The door p/p.r8 h.0008-106-134-11-1-KM
Fun to work with the executive.
![]()
30 January 2023
67 USD
The door p/pg.Vr6 h.0008-106-134-11-1-KM
A very responsible man with whom I am pleased to work.
![]()
16 January 2023
67 USD
Doors p/pg.Vr3 h.0008-106-134-11-1-KM
A teacher with whom I am pleased to work.
![]()
5 January 2023
67 USD
Doors p/pg.Vr2 ch.0008-106-134-11-1-KM
The execution is responsible and holds the deadlines. We are pleased to work with him.
![]()
12 September 2022
134 USD
Development of the CMD on the door Vr1, VR7
The project was completed and well done. Thanks for the rapidity.
![]()
12 September 2022
56 USD
Self flows
The coach did everything quickly and well.
![]()
9 December 2021
38 USD
Перилы 9 шт.
Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно.
![]()
29 November 2021
17 USD
Перилы 6 шт.
Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно. Всё сделано быстро и качественно.
![]()
15 April 2021
22 USD
The project of the wooden veil (base) and the wing
I recommend Mariana as a responsible executive.
The task is performed in time. Always in contact. There was a great engineering solution!
thank you)
6 March 2021
102 USD
Станок для манипуляций с лошадьми
Все ок всем доволен все хорошо
![]()
6 February 2021
13 USD
Create a 3D model
The project is performed according to the requirements. Ordinary and honest worker.
14 November 2020
100 USD
It requires drawing and calculation of the roof by photo
OK, I seem to have finished.
Activity
| Latest proposals 10 | Budget | Added | Deadlines | Proposal | |
|---|---|---|---|---|---|
|
Drawings for the diploma
33 USD
|
|||||
|
Design and optimization of a 3D model of an eccentric clamp (Autodesk Inventor)
33 USD
|
|||||
|
Detail of the dispenser
67 USD
|
|||||
|
Lightweight dump trailer
|
|||||
|
Body
|
|||||
|
Hammer mill for wet chips 60%, productivity from 10 tons per hour
|
|||||
|
Work in Autodesk Inventor Professional 2026
27 USD
|
|||||
|
Design of a lifting table
89 USD
|
|||||
|
Wiring diagram for motors
56 USD
|
|||||
|
Plastic windows
27 USD
|