Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak

Yevhenii Davidenko

Offer Yevhenii to work on your next project.

Ukraine Kyiv, Ukraine
4 hours 44 minutes ago
Available for hire available for hire
1 Safe completed
4 years ago
1 Client
registered for 7 years

Rating

Successful projects
There is no data
Average rating
There is no data
Rating
285
Designing
Engineering

Skills

Portfolio


  • Reconstruction in S. Zvonkovo

    Designing
    The room is intended for the heat supply of the building of a living room for students on the vol.Resurrection in S.Dzvinkovo, Vasilkovsky district of the Kiev region.Size: 8x7,17x3,4(h) mExternal air parameters:
    Calculatory external temperature of burning - -22 ° C;
    Calculating external temperature for ventilation - +20 ° C;
    The average temperature of the outside air for the burning period is -0,1 ° C.The duration of the burning period is 176 days.For the coverage of the thermal loads, the installation is provided in
    Two-Pilot Coaters BRS 100 Comfort
    LM and BRS 150 Comfort Manufacturing Company "Korostan Burning Factory"
    Techniques" (Ukraine), which work on wood and pellets.Nominal Power
    Coats: 99,0 kW and 150 kW.Coefficient of beneficial action of cottles - 84% for burned trees and
    92% of the work on pellets.The total thermal productivity of the ball is 250 kW (0,2149 Gcal/hour).The thermal scheme requires the preparation of a thermal carriage - water with a temperature of 90-70 ° C.The project provides automatic weather-related temperature regulation
    Network water contour of the combustion system using automatic control
    External temperature and temperature sensor (seeThe ATM Division.The project provides for the installation of calculation devices:
    Cold water (calculator) for the heat supply system;
    - Heat energy (computor) with two uterus (on the supply and reverse)
    the pipeline).
  • Building of the Emergency Brigade Support Point

    Designing
    The project facility is intended for the heat supply of the emergency bridges of the PAT branch in the Dniprovsky district.by Kiev.Size of room 7.32x4.2x2.5(h) m.External temperature for heating and ventilation - -22 ° C;
    The average temperature of the outside air for the burning period is -0,1 ̊C.The duration of the burning period is 176 days.For the coverage of heat loads, the installation in the premises of the automated boiler "Logamax plus" GB 162-100 V2 of production by the company "Buderus" (Germany), working on natural gas of low pressure and the heat pump "Octopus" "air-water" IS81 with a heat power of 25 kW.The nominal capacity of the cottage: 94.5 kW (0.0812 Gcal/hour).The coefficient of the beneficial effect of the coat when working on natural gas is 97,0%.Thermal - water with a temperature of 60-40 ° C.The project provides automatic weather-related regulation of the temperature of the direct grid water.The preparation of hot water is provided for the home of the vertical air heater Logalux SU750 with a capacity of 750 liters.The structure of the side allows it to be further equipped with electric shade for water heating.The control of the hot water supply system will be carried out in automatic mode (see.The ATM Division.This functional module allows you to control the work of the circulation pump (position K10).And the work of the circulatory pump will be performed according to the timer work program (work with interruptions or constant).The module is equipped with the function of "thermal disinfection" of the GDP contour, which performs heating hot water once a week to the temperature needed to destroy the legionel (the trigger of respiratory tract diseases).Thermal disinfection should be carried out only at night time in order to avoid humans smoking with water.
  • Warming, ventilation and air conditioning of the apartment

    Designing
    Heating, ventilation and air conditioning in the apartment. Mr. Irpine, Vol. The Northern
  • Recovery of the thermal security of the DNZ in M. Lviv

    Designing
    Recovery of the Pre-School Heat Insurance System
    No. 14 is located at the address: m.Levi and Vol.Newly completed in
    compliance with the design task and with current rules and rules.The main source of heat supply of the combustion system is the electric coat,
    The Protherm Scat.1 .The water burning system is a two-train horizontal fool (75/55 ° C).The circulation of heat in the heating system is provided by the pumps that
    Installed in the cottage on the coal floor.Burning devices on the coal floor are registers of smooth tubes.The 2ndThe pipelines of the combustion system are performed from polypropylene.As a combustion device, the project provides aluminum sectional radiators of type
    "Calidor" production of f-mi "Fondital" (side connection) with the Crane of the type of Mayevsky.Radiators are supplied in painted and in collected form at the manufacturer's factory.3 .The regulation of the combustion system is qualitative.in the regulation.
    This is due to the temperature change of heat, and
    Installation in the equipment that is equipped
    Thermostatic valves with thermal leaves of manufacturing firm "Danfos"..
  • Reconstruction of private housing in you

    Designing
    The following technical decisions are made:
    1 .The cabin is placed on the bottom.0,000 and designed for
    Heat supply of individual housing by vol.The cover,
    in m.Kiev, the Kiev region.2.The heat load is covered by the installation of the condensation boiler
    GB112-60, power of 60 kW of Buderus firm and heat pump "air-water"
    OCHSNER Golf Maxi Plus with a power of 16 kW (at +7/35).The Inverter Type.In the development of the project, the constructive sizes and technical characteristics of the equipment
    by the manufacturer’s creation,
    3 .Removal of smoke gases and dissolving harmful substances into the atmosphere
    It is carried out by a coaxial smoke tube Ø80/125 with a height of 10 m from PP plastic.The heat supply system is closed double.Temperature schedule of heat release for consumers on need : heating 55/50 C, heat
    floor 50/45 ° C, ventilation 60/40 ° C and EEA 70/55 ° C.The hot water supply system is water with a temperature of 50 ° C.and 5.In the cabin is provided natural flow-output ventilation from the calculation
    Air supply for burning and constant 3-fold wind exchange.6 .Heat and heat points are automated, scheduled for work without constant
    the service staff.7 .The pipes are made from the REHAU type RAUTITAN flex pipes.8thThe horizontal parts of the pipelines are placed with a inclination of not less than 0.002.
    The 9.In the top points of the pipelines to predict the aircraft.10 Pipelines are subject to hydraulic testing at pressure 1.25 from the worker, after which
    They are isolated by heat-isolating materials.
  • Reconstruction of the wooden burning system

    Designing
    Reconstruction of the burning system of the building of the wooden processing facility of the NUBIP of Ukraine "Boyarskaya forest research station" in Boyarka, vol. The Forest, 12

Reviews and compliments on completed projects 1

Quality
Professionalism
Price
Availability
Terms

The work is done very professionally, at a high level.

Activity

  Recent proposals 10
Scary intentions of construction
127 USD
Heat floor building
25 USD
Scheme of heat floor discharge by infusion
15 USD
Projects of private house 200m2
25 USD
Translation of drawings into dwg format
13 USD
Проект канализационных закладных в фундамент
61 USD
The Kiev Dimensional Plan
51 USD
Нужны специалисты по архитектуре, ПГС для написания студенческих работ
76 USD
BIM-моделирование обьектов строительства
15 USD
Проектирование ОВиК и ВК в Revit.
44 USD