Budget: 100 EUR Deadline: 12 days
Good afternoon. I perform calculations of structures based on the specified parameters of the sketch project or according to the house plan, based on the corresponding loads.
Project verification requirements:
Perform calculations and check the load-bearing capacity of structures considering climatic loads (snow, wind, and operational loads) according to the building regulations of Latvia (Eurocode, LVS EN).
Check and, if necessary, clarify the types, sizes, and thicknesses of metal profiles to ensure the reliability and cost-effectiveness of the structure.
Check the need for additional rigidity ties, wind ties, and braces.
Specify the necessary measures for corrosion protection and fire safety measures in accordance with local regulations.
Budget: 100 EUR Deadline: 12 days
Good afternoon. I perform calculations of structures based on the specified parameters of the sketch project or according to the house plan, based on the corresponding loads.
Budget: 500 EUR Deadline: 12 days
Good afternoon
I can make a calculation, you will receive a report with the information you need.
Нужно высылать сюда на общее обозрение, иначе это нарушение правил сайта за умышленное сокрытие исходных данных.
Drawings & Diagrams 0 proposals 5 August
Mechanical Engineering & Instrument Making 5 proposals 31 July
Object Design 6 proposals 29 July
Drawings & Diagrams 7 proposals 27 July
Mechanical Engineering & Instrument Making 6 proposals 24 July