It was a task in the design and design.Of the 13 points, the first point was the head and menu.At the time of taking the task, Denis himself appointed a period of 3 days, i.e.72 hours ago.For the first 60 hours on the questions asked, I wrote several times how everything was successful.No one question about design, location, preferences - in the first 2.5 days was not asked.On the eve of the last day, some preparation was loaded under the menu.And another assurance that everything will be in time.At the 70th hour of work, I was asked if I was strongly pressed on the deadlines.At 74, something needs to be optimized.At the 78th hour (6 hour delay) I was that I had a virus on the site, and something was broken.As viruses break the site, instead of sending spam - remains without a response.According to the fact that the site was not only not provided with evidence, but it was not even formulated what the problem was.Here is the most "concrete" description of the problem I managed to get:
"It doesn't work properly the visits of categories, that is, they are seen but you can't go through them."
"The order of actions is easier to describe, I made the menu through the js code, there everything works but not as it is necessary, if to do as it is necessary will be cisterne.. прийнялося solution together with my colleague to do it through the default menu categories of ax or not the regular plugin... Menu doesn't work with the word here in this i's a problem.. it doesn't display and doesn't work"
According to this description, verifying the existence of the problem, as I think, is a bit difficult.If the problem actually exists, then the inability to concrete the problem is not the best har-ka specialist.Detection of the problem with the implementation of paragraph 1 of the 13th of the term after the end of the term is, in my opinion, absolutely incorrect.