Budget: 15000 UAH Deadline: 12 days
Good day. I have experience in designing metal structures, ready to develop working drawings of metal stairs for production: structural scheme, approximate calculation of load-bearing elements (operational load), fastening joints to the floor/walls, detailed drawings, welding diagrams, and metal specifications. The drawings will be suitable directly for manufacturing, ready to clarify the initial data and details of the structure. The estimated completion time is 12 working days.