2) Installation of additional necessary modules and their configuration
3) Backup 8 sites from old hosting (databases, files).
4) Depositing and developing these sites on a new host.
Migration of current SSL certificates from the old hosting to the new.
Configuration of backup of all databases and files to a remote storage
7) Solving problems on the old hostel arising during the transfer process
Translation of websites to https
9)Resolution of problems with the site engine when switching to https