• Projects 41
  • Rating 5.0
  • Rating 5 426

Budget: 7000 UAH Deadline: 1 day

Hello!
I am ready to take on your project and will complete it urgently.
I have extensive experience with similar tasks, so there will be no difficulties.
If I have piqued your interest, feel free to write; I am happy to collaborate!

  • Projects 29
  • Rating 5.0
  • Rating 5 148

Budget: 20000 UAH Deadline: 3 days

I initially see the work as an urgent refinement of the exchange rules - 20,000 UAH and 3 working days after access to the test databases. I opened the materials - 10.cf and the file PUBID_2499156-ExchangeRules_Data_Edit.0528_1312.xml are visible, meaning it is indeed about editing the existing exchange, not developing from scratch =)

Regarding implementation - first, I will check the structure of UT10 and UT11.5.27.58, then I will analyze the current exchange rules, separately reviewing Order and Implementation, mapping attributes, links to nomenclature, counterparties, warehouses, contracts, statuses of processing, and errors during loading. With this version of UT10, a careful analysis is needed because it has been updated in parts, and there may be non-obvious logic for transferring documents.

I need from you the exports of the test databases or access to them within the marketplace, the current exchange rules, examples of 2-3 documents that are currently being transferred incorrectly, and the expected result in UT11.5.

I will clarify 2 things -
> should only new documents be transferred or also historical ones for the period
> Order and Implementation should be transferred with processing or only as recorded documents

Similar project: Доработка CRM системы для управления проектами 3 этап
  • Projects -
  • Rating -
  • Rating 430

Budget: 6000 UAH Deadline: 1 day

Hello!
I am ready to help update the exchange rules. The task is clear, I have been working with Data Conversion 2.0 for a long time.

Here’s how we will solve the task:
1. I will download your configuration of UT 10 (cf) from the link and the current XML rules.
2. I will upload the description of the structure of the modified UT 10 and your UT 11.5.27.58 into the KD.
3. I will analyze the differences in the structure of the documents "Customer Order" and "Sale of Goods and Services" (especially considering that UT 10 was updated in parts).
4. I will configure the conversion rules for the properties of these documents. If necessary, I will write handlers (for example, matching contracts, agreements, warehouses, or filling in mandatory attributes for UT 11.5).
5. I will send you the updated rules for testing on a copy of the database.

  • Projects -
  • Rating -
  • Rating 196

Budget: 18000 UAH Deadline: 3 days

We already have a practically ready solution for 1C exchanges, and it can be quickly adapted for UT10 - UT11.5. We can discuss it here now; I'm available.
Regarding the timeline, I would estimate 2-3 working days, and for the cost - starting from 18,000 UAH for correcting the rules and a test transfer of two documents.
I see 10.cf and xml with the current rules; I will take into account version UT 11.5.27.58. The main risk is likely in the old UT10 after partial updates.
In the work plan - I will set up a test database, verify metadata, adjust document correspondences, tabular parts, counterparties, contracts, and nomenclature, then run a control exchange and provide a list of discrepancies.
AI can be connected after stabilizing the exchange - for example, for analyzing logs, highlighting exchange errors, and monitoring problematic directories.
Please let me know, is the exchange currently through data conversion 2 or 3?
Should we transfer only new documents or also update those that have already been transferred?
- https://business.ingello.com/forma-bpm - close in logic to automating business processes and accounting relationships
- https://business.ingello.com/forma-crm - an example of a corporate system with roles, data, and operational logic
- https://systems-fl.ingello.com - general profile of the Ingello Systems team for projects on the marketplace

  • Projects 6
  • Rating 3.2
  • Rating 792

Budget: 8000 UAH Deadline: 6 days

Ras Bin, I see that you need to set up the correct data transfer for "Orders" and "Sales" between UT 10 and UT 11.5. I understand that with the "fuzzy" UT 10, this requires a special approach to ensure stable exchange.

I will study the current rules and configurations, refine them specifically for these documents, taking into account the specifics of your UT 10, and ensure accurate and reliable data synchronization. As a result, you will have a functioning exchange where all orders and sales will be correctly transferred without manual adjustments.

Please let me know if there are any known errors or discrepancies in the data that you want to correct with this transfer.

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules