Budget: 150 USD Deadline: 3 days
Good day Vera. I work at Autoaad. Dwg, pdf. Deadlines for work 1-3 days.
From the building model (in Revit), the following needs to be done:
1. Stair plans
2. Window plans (Aluminum list) - (according to the example file from another project that I attached)
3. Fence locations
4. Preparation of electrical equipment plans (placement on the plan sheet + reading of electrical equipment)
5. Preparation of plumbing layout plans.
Attached examples of work already completed from another project.
https://acrobat.adobe.com/id/urn:aaid:sc:AP:c5148247-25f9-4539-ad87-fb76ac37af71
https://acrobat.adobe.com/id/urn:aaid:sc:AP:f1aa7eed-2fcb-4a7b-a46d-4cc39697764b
Budget: 150 USD Deadline: 3 days
Good day Vera. I work at Autoaad. Dwg, pdf. Deadlines for work 1-3 days.
Budget: 300 USD Deadline: 3 days
Good day, I can do it in Revit 2024
at the output 3D model + drawings
the deadline depends on the volume
thank you