Budget: 27000 UAH Deadline: 25 days
Good day.
The composition of the project documentation:
- Plan of the pile field with axis alignment.
- Installation scheme of the foundation (lower binding) and the basement ceiling.
- Layouts of all wall panels (marking of posts, beams, braces).
- Scheme of the rafter system.
- Detailing of critical joints (corners, connections, window/door openings).
- Summary specification (volume of timber in cubic meters, area of insulation/boards, fasteners).
Conditions and evaluation:
Development time: 25 working days.
Cost: 27,000 UAH (includes adaptation of drawings to the format of "self-build instructions").
Block factors for starting (to be provided before the work begins):
- Exact geolocation (for load collection).
- Planned thickness of insulation (150 mm or 200 mm).
- Actual or planned type of roofing material.