It is necessary to perform a complete transfer of 2 websites to WebAsyst from the old server (CentOS Web Panel) to the new VPS.
📦 Volume of data:
~35.4 GB (files + databases)
📍 Current situation:
— old server: CWP (CentOS Web Panel)
— new server: VPS (Hostinger)
— access is available
📌 What needs to be done:
1. Transfer all website files
2. Transfer databases (MySQL)
3. Configure VPS:
— PHP
— MySQL
— access rights
— web server (Apache/Nginx)
4. Connect domains
5. Configure SSL
6. Complete functionality check of the websites
📌 Important:
— without data loss
— minimal downtime of the websites
— correct operation of the admin panel
— experience with WebAsyst is preferred
📌 Expected result:
The websites are fully operational on the new server without errors.
📌 Access will be provided after the selection of the performer.