Business plan "Establishment of a network solar power plant"
Examples of work, portfolio
Business plan "Establishment of a grid-connected solar power plant"
Industry, energy, renewable energy sources (RES)
Purpose of the business plan:
- Justification of investments in the construction of a private grid-connected solar power plant with a capacity of 30 kW for the sale of electricity at the "green" tariff or using the self-sufficiency model.
- Brief description: the plan includes a feasibility study (FS) with calculations of insolation, selection of equipment (panels, inverters), an estimate of installation works, and costs for connection to the grid.
The key aspect is the analysis of the "green" tariff and forecasting cash flows, as well as risk analysis related to changes in government regulation.
- Practical result/Outcome: the financial model allowed for the calculation of the exact payback period — 3.5 years (at the current tariff) and demonstrated a return on investment (ROI) of 28%.
This enabled the attraction of a private investor, reliably confirming the stability of cash flow and the high profitability of the project.
Business plan "Establishment of a grid-connected solar power plant"
Industry, energy, renewable energy sources (RES)
Purpose of the business plan:
- Justification of investments in the construction of a private grid-connected solar power plant with a capacity of 30 kW for the sale of electricity at the "green" tariff or using the self-sufficiency model.
- Brief description: the plan includes a feasibility study (FS) with calculations of insolation, selection of equipment (panels, inverters), an estimate of installation works, and costs for connection to the grid.
The key aspect is the analysis of the "green" tariff and forecasting cash flows, as well as risk analysis related to changes in government regulation.
- Practical result/Outcome: the financial model allowed for the calculation of the exact payback period — 3.5 years (at the current tariff) and demonstrated a return on investment (ROI) of 28%.
This enabled the attraction of a private investor, reliably confirming the stability of cash flow and the high profitability of the project.