Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak

• PTO engineer services: 3D modeling of assemblies, volume calculation

Executive scheme of dismantling works (Capital repair of an administrative building)
This project presents a sample of professional executive documentation developed according to strict PTO standards.
Why this approach saves your money:
Absolute accuracy of calculations: Thanks to the use of BIM technologies and 3D modeling (SketchUp + LayOut), all areas and linear dimensions are verified with an accuracy of up to a millimeter. This completely eliminates any discrepancies between the client and the contractor during the signing of the acts of completed works (KB-2v).
Engineering audit: During the development of the scheme, I do not just draw lines, but check the design solutions for conflicts and "hidden" volumes. In this example, the actual area of ceiling dismantling was 42.76 m², which confirmed the design data and ensured 100% transparency of reporting.
Standardized documentation: The documentation is fully ready for submission to technical supervision. It includes a visual graphic part, a table of technical and economic parameters, and a detailed statement of the volumes of dismantling operations.
Full cycle of works: From analyzing the initial plans and creating a "digital twin" of the premises to forming a ready-to-print package of drawings in PDF/PNG formats.
What services I provide:
• Creation of accurate 3D models of buildings and structures based on your measurement drawings.
• Spatial 3D calculation of the volumes of dismantling and installation works of any complexity.
• Detailing and development of complex construction nodes (roof, mauerlat, facade systems, monolith).
• Formation of statements of work volumes (SOV) for tender documentation and preparation of estimates.
My engineering approach minimizes the financial risks of the client and guarantees successful passing of inspections by regulatory authorities. Contact us, and we will bring order to your construction volumes!
Work details
Budget 22 USD
Added 6 April
101 views
Freelancer
Yevhenii Kozma
Ukraine Kyiv
No reviews

Available for hire Available for hire
On the service 2 months 14 days