System for monitoring the loading of chemical reagent rods into the well.

Embedded Systems & Microcontrollers
Job 2 of 7
The main task of the system is to count the unloads (successful, stuck, empty) of reagent rods into the gas well (removal of water from the bottom of the wells using the reagent), maintaining a log of unloads, with the determination of the time and place (GPS data) of the unload, the ability to transfer the data log from the control device to the shift master's smartphone with the appropriate software via Bluetooth.
Details
  • Added:
300

Freelancer

  • Projects 15
  • Rating -
  • Rating 337
Register

If you have an account, log in

Indicators