Please select
  • Projects 13
  • Rating 5.0
  • Rating 6 505

Budget: 600 EUR Deadline: 3 days

I am ready to perform the work with a complete and detailed calculation of the structure "down to the brick."
I work not schematically, but constructively and technologically:
• I take into account the thickness and volume of all joints;
• I count whole blocks and cuts without assumptions "by eye";
• I lay out each row separately, with reference to the foundation;
• I work out the direction of block laying and the logical sequence of assembly;
• I consider the initial layering (metal / fiberglass / refractory concrete) as a single assembled system.

Additionally, I can prepare a detailed estimate and specification of materials:
volumes, positions, cuts, reserves — everything is transparent and suitable for both procurement and production control.

Oleksandr L.

Oleksandr L.

Winning proposal
71 0
  • Projects 53
  • Rating 5.0
  • Rating 4 323

Budget: 600 EUR Deadline: 14 days

I will create a 3D model in SolidWorks with the ability to view it in eDrawings or in a web browser. Development stages - see in the profile. After discussing and agreeing on the design - preparation of drawings for the required manufacturing technology. We will determine the final deadlines and cost of the project during the discussion of project details.

Similar project: Камин-капля технические чертежи
Camino and Marble.
  • Projects 4
  • Rating -
  • Rating 552

Budget: 610 EUR Deadline: 10 days

Good afternoon. For a correct understanding of the scope and technical features of the work on the lining of the heating furnace, I ask you to provide the available project and technical documentation (drawings, diagrams, sketches, detailed technical specifications). This will allow for a thorough analysis of the task, take into account all requirements, and propose the necessary technical solution for the quality implementation of your idea.

  • Projects 91
  • Rating 5.0
  • Rating 6 541

Budget: 610 EUR Deadline: 10 days

Good afternoon, I am ready to discuss your project and clarify all the details. The deadlines are conditional.

  • Projects 38
  • Rating 5.0
  • Rating 1 514

Budget: 610 EUR Deadline: 15 days

Please provide the overall existing drawing and drawings of the necessary lining blocks indicating the materials. In what format are the drawings required?

  • Projects 29
  • Rating 4.7
  • Rating 965

Budget: 610 EUR Deadline: 9 days

Hello.
I will do the work quickly and efficiently.
A lot of practical experience.
My portfolio https://3ddomkiev.wixsite.com/website-2