Task for a DevOps engineer: Migration of the project from Vercel to the server, setting up CI/CD, and containerization with Docker
Main tasks
Set up Docker containers for the application:
Create a multi-stage build from the existing docker-compose.
Set up CI/CD pipeline with GitHub:
Create a CI/CD pipeline with GitHub Actions for automatic building of the main branch.
Set up deployment of containers to the server with automatic image updates on each successful commit.
Add the ability to change environment variables:
Set up an admin panel for updating environment variables and restarting containers after their changes.
Budget: 70 USD Deadline: 5 days
Good day. I am ready to discuss the details of your task. Write to me. Thank you.
Budget: 150 USD Deadline: 5 days
Hello, Elvin Aliyev.
I have an extensive experience in using Docker and Kubernetes for deployment in cloud services.
I am very familiar with docker, docker-compose, Github action and CI/CD.
So in order to build the CI/CD system, it's good idea to interact with Github and use Github action. That is very easy and clear method.
So first, we should build docker image using docker or docker-compose in multi-stage build method.
And then, we can define CI/CD pipeline with Github Action. So I think, k8s is really good for deployment. Docker and k8s are good couple for deployment.
In my opinion, you can adapt load-balancing and auto-scaling in order to make your website more flexible and scalable by using kubernetes.
I can provide you with perfect CI/CD system using Docker, Kubernetes, Github Action, Grafana and Promethus.
Best Regards.
William.
Budget: 50 USD Deadline: 7 days
Good day, I am ready to start working on this order as soon as possible.
Доброго дня, Опишіть технології, і повний проект можна було обговорити, щоб ви продемонстрували все що є і що хочете зробити. Бо на перший погляд нічого складного як завжди. Але потрібні деталі для визначення повної вартості! Можливо Лоадбалансери і все таке. Спочатку можете надати посилання на сам застосунок! ДЯкую
It is necessary to perform the update, transfer, and configuration of Laravel projects to a new server, ensuring stable operation, security, protection against exploits, and correct functioning of all services after migration. 1. Main tasks Prepare the new server for operation. Transfer project files, databases, configurations, and cron jobs. Update server software. Configure a secure environment for Laravel. Check compatibility of PHP, Laravel, Composer packages, and dependencies. Ensure protection against known exploits, malicious requests, and unauthorized access. Set up SSL certificates. Check the functionality of the websites after the transfer. 2. Transfer of Laravel projects For each project, it is necessary to: Transfer project files. Transfer the database. Transfer the .env configuration. Set directory access permissions: storage bootstrap/cache Check functionality: homepage; admin panel; authorization; forms; API; file uploads; email sending; cron jobs; queue workers.3. Security and protection It is necessary to implement basic and application-level protection: close root access via SSH; configure SSH access only via keys; change the default SSH port if necessary; configure the firewall; allow only necessary ports; install Fail2Ban; hide service versions of Nginx/Apache/PHP; restrict access to .env, .git, backup files, log files; set correct file permissions; check projects for malicious files; check Composer packages for known vulnerabilities; update dependencies if it does not break functionality; configure protection against SQL injection, XSS, CSRF, and path traversal; check the correctness of Laravel APP_ENV and APP_DEBUG; set APP_DEBUG=false in production; configure rate limiting for critical endpoints; check access to storage/uploads; configure protection against PHP execution in upload directories; check access rights to admin panels. 4. SSL and domains It is necessary to: Install SSL certificates. Configure automatic SSL renewal. Enable redirect from HTTP to HTTPS. Check the correct operation of websites via HTTPS. 5. Backup It is necessary to configure backup: project files; databases; .env files; uploaded media; cron configurations; Nginx/Apache configurations. Backup should be performed automatically on a schedule. It is preferable to store copies separately from the main server. 6. Post-transfer verification After migration, it is necessary to check: absence of 500/403/404 errors; absence of critical errors in Laravel logs. 9. Result of execution After the work is completed, there should be: Laravel projects successfully transferred to the new server; websites are functioning stably; SSL is configured; the server is protected with basic security settings; access to critical files is restricted; backup is configured; cron and queues are operational; the old server can be turned off after final verification.
We have a dedicated server on Hetzner with a website on Docker (+ Laravel framework) Contact with the developers has been lost Need to: - restore and change server access (probably SSH) - recommend a storage location and set up a full server backup with easy recovery, probably not on Hetzner for security - fix the logo that is not displaying for some reason (it's unclear why the file has become inaccessible) Important - there is no website backup, and there is no room for error. We will only consider experienced specialists.