Metal construction 40x7x7 meters
We will cooperate in the future.
I strongly advise as a reliable and professional executive.
Budget: 30000 UAH Deadline: 30 days
Hello, ready to implement in two stages of development, write me.
Budget: 135000 UAH Deadline: 65 days
Hi, I’m working on the Tekla Structures program all the drawings can be transmitted in the .dwg format and the BIM model transmitted in the Tekla Structures fluid program format.
Budget: 10000 UAH Deadline: 14 days
Good time for the day! Interested in your project, ready to discuss the details and begin the work! There is experience in carrying out such projects (more details can be seen in the portfolio). There’s a small nuance, I’m working in the SW 16 software environment, formats I’ll be able to issue as you described in TZ, if this moment isn’t disturbing, then I’ll be pleased to collaborate!
Budget: 1000 UAH Deadline: 10 days
Hello to you!!The !
The task is quite powerful if there is an interest call it.
With respect to Sprinterivan.
Budget: 40000 UAH Deadline: 40 days
Listen to Daphne. and sharia.
Third-third, I’m going to go to the house, I’m going to go to the house.
I give the charcoal. I know to do.
You are the Daffalen and the Radaca.
Проблема в заках.
То Срочники, то Быстрики, то Сжатики, то Навчерашники.
"Просьба отнестись серьезно". Можно подумать, что тут все сидят и на отвали делают проекты. А тут зак попросил отнестись серьезно и такие все подумали: "А, ну если просит, то отнесусь серьезно".
А сам не хочешь отнестись серьезно не подгоняя людей своей срочностью? Это твои проблемы, что у тебя уже горит. Исполнители здесь ни при чем. Работа серьезная, куда ты спешишь.
Еще раз в чем Ваша проблема? Никто никому ничего не должен... Я что Вас подогнал в какой то работе или может быть напряг чем то? Я опубликовал проект и изложил условия которые мне интересны. Если они Вас чем то не устраивают зачем тогда делать ставку а тем более гадить в форуме? Или может это вызвано тем что мне просто не понравилась Ваша манера общения и мне не приятно с Вами общаться и я отклонил вашу ставку?
И на будущее - научитесь профессиональному общению потому что при всех Ваших возможных профессиональных навыках вы больше похожи на форумного тролля...
И да, на "ты" с "тобой" никто не переходил...
Спасибо, как нибудь сам решу что делать, я же фрилансер (от слова "свободный").
Всего хорошего! Успехов в работе! Хорошего дня и хорошего настроения!
Извини, если чем обидел, писал от души, без злого умысла.
Мимо здесь ни кто не проходит. Да грубовато немного Двутавр ответил. Но прав. Двутавр кстати хороший конструктор.
Валерий,
я не сомневаюсь что Двутавр хороший конструктор, его портфолио выглядит не плохо и я готов был бы рассматривать его предложение серьезно если бы не его подход в общении. Думаю Вы согласитесь что когда есть дискомфорт в общении хорошего результата не будет даже если с двух сторон специалисты своего дела. Я как заказчик хочу получить профессионально сделанную работу в сроки которые меня интересуют и не тратить свои нервы в процессе. Я работаю как подрядчик в промышленном строительстве (инженерные сети) уже 18 лет и за этот срок сделал не мало больших проектов и поработал с огромным количеством людей. Если мне не нравится подход клиента я просто не беру такой проект при этом не начинаю доказывать кому то что либо.
Да и не надо меня рассматривать, я со срочниками не работаю.
Не помешало бы уточнить в какой конкретно программе(ах) надо разработать проект. А то, в семействе, пишет. Не ну....
Блин я чего то в этой жизни не понимаю... Это Ваш текст в ставке которую Вы сделали: "Слущай, дафай сдэлаю. Шарю. 3-тэ матель сдэлаю, умэю харащьо.
Чэрьтэщи сдэлаю харащьо. Умэю делать. Будэщь ВАХ дафолэн и радаваца." ?Если Вы не работаете со "срочниками" то зачем было подавать заявку и разводить срачь в комментариях? В проекте четко написано "работа срочная", если это не Ваше то и нехрен на нее подавать заявку.
По поводу "программ": я четко написал что я жду, мне все равно в какой программе работает проектант, мне важно иметь 3d модель в Step или в dwg формате т.к. она должна интегрироваться в Autodesk Inventor. Если проектант работает в программных продуктах семейства Autodesk то данная процедура упрощается.
Если честно то Ваши посты становятся все более смешными и выглядите Вы в них все более не профессионально....
Девять человек откликнулись на проект, уже вторые сутки пошли, работа срочная, а я до сих пор читаю ответы на свои тупые комментарии, ответы на пол страницы.
Давайте же поржем вместе со срочности проекта. Я уже начал.
Мне плевать с высокой горки на то, насколько профессионально или нет выглядят мои комментарии или я сам. Школу я давным давно окончил, со всех работ также уволился.
Я бродяга, свободный человек и это мне очень нравится. Все, кто хотят меня как то оценить, определить уровень по шкале ритера или клитера - гуляйте густым лесом 😄
Я, например, в Tekla работаю. Это семейство для вас, чи не? Или может озвучите что-то конкретно.
7000 гэрэнэ? Чё серьезно??? Кто-то уже делает за 200 баксов???
Ухаха, я хотел бы посмотреть на фото этого исполнителя 😆 Наверное не только я.
Task: Designing an interior magnetic lock with forced retraction of the magnetic slider.Basic analog (reference for dimensions): AGB TouchCritical difference from the analog (Essence of the mechanics):In the original AGB Touch, the slider with the magnet is retracted only by the force of the door's locking/pulling. In the developed lock, it is necessary to implement forced mechanical retraction of the magnetic slider into the housing with a slight pull of the door handle towards oneself.Mechanism operation logic:In the initial position (handle in the initial position), the slider with the neodymium magnet is pushed forward by a built-in spring (towards the strike plate of the frame).When pulling the door handle towards oneself, the internal catch (lever finger) should slightly engage the magnetic slider and forcibly pull it inside the lock housing, completely hiding the magnet in the end.Upon releasing the handle, the return spring returns the magnetic slider to the initial (extended) position.A locking device should be provided to block the movement of the door handle towards oneself. Similar to a WC lock.Output requirements: Assembly in STEP or IGES format, suitable for test 3D printing on an SLA/FDM printer.
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.
It is necessary to make an analysis of the project (drawing) of the advertising installation with a description. Dimensions: Width: up to 2.25 m Height: up to 2 m Depth: up to 1 m
packaging solutions / flexible packaging). It is necessary to develop a prototype of a two-chamber packaging for a food product. Idea: The packaging consists of two separate chambers with different ingredients. Upon strong compression of the packaging, the internal partition should controllably break, after which the contents of the two chambers mix. The user then shakes the packaging and opens it for consumption. Requirements: Develop the packaging design. Select materials and production technology. Create a working prototype. Prepare the packaging for mass production. If necessary, assist in finding a manufacturer. Preferred experience: Flexible packaging (sachet, doypack, flow-pack, etc.). Development of custom packaging solutions. Food products or dietary supplements. Understanding of film welding technologies and creating breakable internal partitions. Example concept — BOOMSHOT packaging (in the photo): two chambers that mix upon compression.
TECHNICAL TASK (TT)For the design and calculation of a large frame aquarium structure1. GENERAL INFORMATION AND PURPOSE Product type: Large demonstration frame-type aquarium. Purpose: Public/private interior aquarium for keeping hydrobionts. Objective: Development of design documentation (DD) for the manufacture of a metal frame, selection and calculation of the thickness of multilayer glazing (triplex), design of the base with waterproofing nodes, as well as calculation of elements for transportation by forklift.2. GEOMETRIC AND WEIGHT PARAMETERS External dimensions of the structure (L×W×H): 4000 × 1800 × 1400 mm. Height of the water column (maximum): To be structurally accepted as equal to 1300 mm (taking into account technological underfilling). Configuration: Rectangular basin with a 360° view (all 4 vertical sides — transparent glazing). Weight limitation (dry weight): The maximum weight of the fully assembled finished product (metal frame + installed glazing + bottom elements) must not exceed 3000 kg (3 tons). This is a critically important condition for ensuring logistics and the lifting capacity of rigging equipment.3. TECHNICAL REQUIREMENTS FOR CONSTRUCTIVE ELEMENTS3.1. Metal Frame (Structure) Type of construction: Spatial welded frame made of steel profile with a continuous perimeter fixation for each glass. Each of the 4 glasses is a separate panel glued into the quarter (groove) of the metal frame on 4 sides. Stiffness: The structure must have maximum stiffness against bending and twisting. The deflection of load-bearing elements under full static load must not exceed permissible values to avoid the occurrence of peak local stresses in the glass and adhesive joints. Supports: Provide supports for precise leveling and even weight distribution on the foundation/base. They may be non-adjustable.3.2. Glazing (Vertical Walls) Material: Multilayer laminated glass (triplex) based on tempered or float glass of increased transparency (type Optiwhite). Optiwhite Perform strength calculations for hydrostatic pressure. Determine the final safe formula for triplex (layer thickness and type of polymer film — PVB / SentryGlas), ensuring minimal weight with required strength. SentryGlas Calculate the depth of glass embedding in the frame and parameters of the deformation adhesive joint.3.3. Bottom of the Aquarium and Transport Nodes Base construction: Rigid frame base of the metal structure, covered with moisture-resistant sheet material (moisture-resistant plywood/composite). Bottom waterproofing: Finish coating with specialized PVC membrane ("pool foil"). Forklift clearance: The lower beam of the frame must have a structural clearance from the floor of at least 100–120 mm for unobstructed entry of forks. Pockets for the forklift: Design through guide pockets (slots) in the structure of the pallet for standard dimensions of heavy forklift forks. The pockets must pass through the entire frame for the possibility of lifting the product from either of the two long sides (4000 mm).4. CALCULATIONS AND LOADS (MANDATORY PART) The designer must provide verified calculations (including finite element method — FEM / FEA) on the following points: Hydrostatic load: Calculation of the pressure of the water column up to 1300 mm on the vertical walls and bottom (total water volume about 10,000 liters, operational weight ~10 tons). Glass strength calculation: For bending and strength considering the safety factor for frame-type aquarium constructions (not less than 3.0–4.0). Metal frame calculation: Static calculation of the filled aquarium for stiffness and deflection. Adhesive joint calculation: Selection of parameters and thickness of structural silicone/polyurethane for shear and pull-off under water pressure. Weight audit and optimization: If the total dry weight of the metal frame and calculated triplex exceeds 3 tons, measures must be taken to lighten the structure (use of high-strength steel grades with reduced profile cross-section, optimization of triplex structure, use of lightweight composites for the rough bottom).5. REQUIREMENTS FOR THE DOCUMENTATION TO BE ISSUED (DD) After the design is completed, the contractor provides: An explanatory note with calculations of the strength of the frame, glazing, and rigging nodes. Assembly drawings of the metal frame (marks KM/KMD) with a specification of metal products. Drawings of details and cutting maps of bottom elements. Detailed drawings of connection nodes: "glass — metal" "glass — damper — adhesive" "sealing of the joint PVC membrane bottom — glass — frame" "pockets for the forklift" A specification of all materials (steel grade, exact triplex formula). A 3D model of the product in a neutral format.