Budget: 5200 UAH Deadline: 3 days
Hello, Ivan!
I am responding to your points:
1. Similar tasks: I have performed audits and migrations of Windows Server 2016/2019 — including RDS farms, AD roles, SQL Server databases, and 1C/BAS working environments. I have migrated both physical servers (P2V via Veeam) and virtual machines (replication between hypervisors).
2. Windows Server 2016 + Hyper-V / SQL Server / 1C: yes, I work with this stack regularly. I know the nuances of RDS 2016 licensing, MSSQL configuration for 1C databases (TempDB, memory settings, backup jobs), and backup through Veeam.
3. How long the audit will take: 2–4 hours — depending on the number of roles, data volume, and number of users. It is better to formalize the audit as the first stage with a separate report.
4. Steps:
— Audit of the current server: roles, users, permissions, network settings, firewall, backup configuration;
— Preparation of a migration plan and risk assessment (downtime, dependent services, licenses);
— Creation and verification of a full backup (Veeam or built-in tools);
— Migration to the new server/VM with minimal downtime;
— Verification of all users, roles, services (RDP, SQL, 1C) after migration;
— Configuration of secure remote access;
— A brief instruction: what has been done and how to recover in case of failure.
5. Cost: 5200 UAH for the full cycle (audit + plan + backup + migration + verification + documentation). I work through Freelancehunt Safe.
Please clarify: is the server physical or virtual? Where are we migrating to (new physical server, VM on Hyper-V/Proxmox, cloud)? How many users are there, and is there SQL Server + 1C?