Good day, I will complete the section of the POB (construction organization project) for this object quickly and efficiently. I have over 15 years of design experience in a Design Institute (civil and industrial construction). The price and deadlines depend on the complexity of the object and the receipt of initial data.

  • Projects -
  • Rating -
  • Rating 334

Budget: 27000 UAH Deadline: 20 days

Hello! I am ready to take on the development of the construction organization project (COP) for this facility. I have over 10 years of practical experience in design. I have completed projects for both residential multi-story buildings and commercial facilities (including shopping centers). I have a good understanding of the specifics of organizing the construction of complex facilities with underground and multi-level parking, dense development, and phased commissioning.

I approach the development of the COP not formally, but with a real understanding of the construction process — taking into account site logistics, equipment operation, construction phases, and optimizing the client's timelines and costs.

The final cost of development is determined after a detailed processing of the initial data and technical specifications. After agreeing on all parameters, a final fixed commercial proposal is provided.

I will be happy to collaborate and am ready to promptly start working after agreeing on the details.

  • Projects -
  • Rating -
  • Rating 321

Budget: 27000 UAH Deadline: 50 days

Hello, an example of the graphic part (drawing) of the "construction organization project" section is here -- Google Drive The deadline for a project like yours is 50 days, the price of 27 thousand is the maximum rate in the category; the price will be different, finalized after reviewing the project documentation: design specifications, general plan, architectural design, construction design, calculation of the consequence class, construction regulations, technical conditions for connection to networks, topographic survey, and comments and wishes - this is what will be needed if we work together. Also, if we work together, we will need the details and information about the organization that will actually carry out the preparatory and construction works to understand their capabilities and what equipment they will use for construction. To start, to generally assess, the project documentation must already be developed - design specifications, general plan, architectural design. I can perform as a "contractor" or "architect" but without a certificate and not as a sole proprietor - that is, I will exclude the graphic part and make an explanatory note without stamps. Please contact me if this is not a budget project, meaning if the construction is funded by private investors and not by budget funds; I do not work with budget projects. I work remotely, with partial advance payment, and I am located in the Lviv region. 10 tons per square meter is a maximum of two sections; you have divided it into queues, it says one queue (?), if building in one queue, then it will have a high consequence class SS3 with significant consequences, you will need to design it through a firm that is a design institute - it needs to be divided into queues (launch complexes). Please contact me, good evening.

  • Projects 16
  • Rating 5.0
  • Rating 1 306

Budget: 22000 UAH Deadline: 7 days

Hello) I will complete the construction project (graphic part - site plan, additional drawing sheets for the construction project, textual part). You will receive the finished project in pdf and dwg.