Dmitro Vasilenko
Winning proposal- Projects 67
- Rating 5.0
- Rating 4 151
Budget: 1500 UAH Deadline: 7 days
Ready to perform. The work will be in the best quality with nodes+collections of specifications and external view.
Budget: 5000 UAH Deadline: 14 days
Hello to you!
Ready to fulfill your task!
I have experience and education in the direction of Architectural Design and Interior.
There is finished work and there is a summary. I can send you!
Post: [email protected]
+38 (066)007 64 29
Budget: 3800 UAH Deadline: 5 days
Good day . Ready to perform. Question: whether you agree to concrete the corner by pre-exercing deepening in the ground, rather than simply hit the ground - this is an unacceptable solution from a technical point of view.
[email protected]
Viber, WhatsApp, Telegram: +380972477519
of MOB. The body.: +380972477519
Budget: 6000 UAH Deadline: 10 days
Good day, we are doing and counting.
Our projects and objects on the website: http://steelwork.org
Budget: 4000 UAH Deadline: 1 day
Good day . I am engaged in projecting. different types and designs. in the NIP. I specialize in mat. Analysis and solidity calculations. Ready to perform.
Budget: 5000 UAH Deadline: 1 day
Ready to perform. Contact us to discuss details and volume, cost and time
Email: [email protected]
by Skype: Borriall
Engineer-Designer - 11 years experience:
Industrial Facilities (Prom. 40mx180m and ABK - metal.carcas + sandwich panels)
- designed private coatings (250m2 - 2nd floor);
Commercial and office premises (60x80m2)
Advertising designs, calculation of fixing elements;
- small architectural shapes (cats, commercial pavilions/blocks, public transport stops)
- the strengthening of public buildings and private houses (drenage);
- the development and calculation of structures or projects entirely;
Developing individual stairs
I work for Investors, Autocad with SPDS (VetCad+), Advance Steel
Scad calculation can be handmade.
My work (part)
Google Drive
Budget: 1234 UAH Deadline: 1 day
I do it.
More accurately on the cost and deadlines - by clarification of the details of the project.
Go to turn.
••••••
by qwerity.jimdo.com
Proposals concealed
Proposals are currently absent
-
Andrey Stepanchenko 14 March 2018В данном случае актуально рассматривать два варианта свайных опор:
-винтовые сваи;
- буро набивные сваи с применением анкерного уголка.
Технико-экономические и экологические характеристики сравнить и принять соотв. решение.
-
Andrey Kovalsky 15 March 2018Вопрос: согласны ли Вы уголок бетонировать, предварительно выполнив скважину в земле, по типу свай, а не просто забить в землю - это неприемлемое решение с технической точки зрения.
Current freelance projects in the category Object Design
Furniture for the laundry room
I'm looking for a furniture designer for a small project. I need to develop furniture for a laundry room in a private house. What is needed: to propose practical furniture layout; to consider the placement of the washing and drying machines; to provide storage spaces for household chemicals, a laundry basket, an ironing board, and other items; to prepare drawings or a scheme for manufacturing the furniture. Available: dimensions of the room; an example of how the furniture should approximately look. Experience in designing built-in furniture (kitchens, wardrobes, etc.) will be an advantage. When responding, please send: examples of similar works; an estimated cost; the completion time. If everything goes well, we plan to establish a long-term collaboration.
It is necessary to design a cabinet with two drawers for the bathroom. White color. The drawers should have soft-close mechanisms. We will assemble it ourselves. The cabinet stands on legs.
Develop for two devices: general assembly drawing of the metal frame; general assembly drawing of the service platforms; detailed drawings of ladders; detailed drawings of railings; detailed drawings of equipment supports; specification of metal products; St3 or 09g2s As a result of the design, it is necessary to obtain: 3D model of the frame. General assembly drawing. Specification of metal products. Calculation of the load-bearing capacity of the structure (will be a plus). Description of the device:ParameterValueType of deviceVertical reactor with a stirrerWorking volume2.0 m³Total volumeabout 2.36 m³Body diameterabout 1500 mmHeight of the deviceabout 4265 mmBody materialSteel with enamel coatingType of stirrerAnchorStirrer rotation frequencyabout 85 rpmHeat carrierThermal oil
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.
It is necessary to make an analysis of the project (drawing) of the advertising installation with a description. Dimensions: Width: up to 2.25 m Height: up to 2 m Depth: up to 1 m