Budget: 25000 UAH Deadline: 30 days
Good day. Individual entrepreneur 3rd group. I will carry out the project in a team with a specialist in this field of OV.
Good day, the price indicated is for reference.
It is necessary to develop a complete project(s) for heating a private house with underfloor heating (WATER).
1st floor, 102.3 m3. However, not all areas will be heated, approximately 90 m2
We consider it as the main single source of heating.
We also want to add fan coils for cooling in the summer.
The project will be provided to candidates or the selected contractor.
Please indicate the final price with all taxes (FOP, LLC) and what is included in your project.
It would be good if you provide a sample of your work.
NEEDED:
-to study the drawings (construction, insulation)
-possibly visit the site
-fully develop the project (not to take 100 W per square meter of heat loss, but to calculate the heat losses of each room in your house - as it should be done, then calculate heat losses with air infiltration - because the house loses heat not only through walls, roof, and ceiling)
-based on this information, select the underfloor heating and its settings, so that the floor covers the heat losses of the room and at the same time does not overheat the floor.
The drawings must include calculations of heat losses, hydraulic calculations, etc. Based on which the settings of the underfloor heating circuits are selected, etc. (each circuit must be adjusted according to heat losses, so that there is no overheating of the screed and it is sufficient for the desired temperature).
Budget: 25000 UAH Deadline: 30 days
Good day. Individual entrepreneur 3rd group. I will carry out the project in a team with a specialist in this field of OV.
Budget: 4998 UAH Deadline: 12 days
Ready to execute your project in AutoCAD. Heat losses and hydraulics are developed in specialized programs Audytor OZC and C.O. All necessary calculations on the plans are provided. All necessary data from the client and architects is required. In addition, please indicate whether it is necessary to develop a boiler room. I have developed and implemented similar projects. I can provide projects for review.
A model of a house needs to be placed on the plot and the real dimensions of the plot should be tied to the plan. The results with AI are not good. An example is in the photo. A rough version is needed, but as close to the original as possible.
I am looking for a designer to develop a partial design project (functional layout of the space, design, visualization, furniture selection) for a children's area with a large sandbox. It is necessary to create a modern, stylish, and functional interior with proper zoning. The project is funded by a grant within a veterans' initiative, so the budget for design is limited. If you are interested in participating, please send your portfolio, estimated cost of work, and timelines for completion.
Need a teacher with experience in online teaching who will demonstrate the use of AutoCAD from scratch to a group of students online. (Preferably - experience in the architectural field) Topics: Introduction to AutoCAD Basic drawing tools Editing drawings Layers and object properties Hatching and formatting Text and tables Dimensions Blocks and attributes External references and drawing organization Preparing drawings for printing Practical work Final project Conditions: 700 UAH/hour. Online, on weekdays, evening time from 18:00
Quantity Surveyor needed for detailed analysis of a construction project We are looking for a specialist to thoroughly analyze the project documentation of a construction site and prepare a detailed list of all materials, volumes, and types of work.Main Task Based on the project documentation, a complete quantity take-off of the project must be performed, and a transparent table of all construction materials and volumes must be prepared. The initial data may include: architectural drawings — AR; structural drawings — KJ / KM; specifications; PDF; DWG; Excel files; if available — BIM/Revit model. We need not just a general construction estimate, but a maximum detailed Quantity Take-Off and Material Breakdown.What needs to be done 1. Complete Quantity Take-Off Calculate the actual volumes according to the project: concrete by grades and structural elements; reinforcement broken down by diameters; metal structures; formwork; blocks and bricks; cement; sand; gravel; plaster; floor screed; waterproofing; roofing materials; facade materials; tiles and stone; ceiling materials; door and window structures; glass; wood; paint; fasteners; consumables; other materials present in the project. The list should be formed as detailed as possible, without combining different materials into general positions. For example: Reinforcement Ø8 — kg Reinforcement Ø10 — kg Reinforcement Ø12 — kg Reinforcement Ø16 — kg Concrete B25 — m³ Concrete B30 — m³ AAC Block 100 mm — m² / pcs. AAC Block 150 mm — m² / pcs. 2. Breakdown by project sections All volumes must be structured at least by the following categories: Foundation; Structural Frame; Slabs; Walls; Roofing; Facade; Flooring; Ceilings; Doors & Windows; Waterproofing; Finishing Works; External Works; other project sections. It is also desirable to separate materials by floors, buildings, villas, blocks, or zones of the site, if the project structure allows. 3. Material Breakdown A separate table of all materials needs to be prepared in the format:SectionMaterialSpecificationUnitQuantity The goal is to obtain a complete list of materials required for the construction of the site, with actual quantities. 4. BOQ — Bill of Quantities A structured BOQ needs to be prepared separately:SectionWork ItemMaterialUnitQuantity If possible, also separate: Materials; Labor; Machinery / Equipment; Transport; Waste Allowance. The main task is to ensure the ability to see the net cost of materials separately from the contractor's work cost. 5. Excel model The final work must be provided in Excel. Desired format:CodeBuildingFloorSectionMaterialSpecificationUnitDesign QuantityWaste %Purchase QuantityUnit PriceTotal Cost Additional Task It would be an advantage if the specialist can create a template system for future projects. Our goal is to use a unified structure Cost Database for analyzing different construction sites in the future. We want to be able to compare: concrete, kg of reinforcement, and materials per 1 m² of construction; cost of structures per 1 m²; materials for one room; materials for one villa; cost of individual construction elements; planned volumes against actual purchases; potential material overruns. Requirements for the Specialist We are looking for a person with practical experience: reading architectural and structural drawings; working with AR, KJ, and KM; Quantity Take-Off; BOQ; construction estimates; analysis of construction volumes; Excel. Important We do not need just a rough estimate of the total project cost. We need a specialist who can break down the project to the level of individual physical materials and quantities. The main result of the work: A complete and verifiable list of all construction materials and volumes of the site that can be used for procurement, tenders, cost control, and checking for overruns. When responding, please indicate: Your experience working with AR, KJ, and KM. Examples of completed BOQs or Quantity Take-Offs. Which programs you work with. Can you work with PDF, DWG, and Revit. How you verify the accuracy of calculations. What format of source files you need. Your cost for the project or cost per m². (Project 1000m²)