Budget: 3200 UAH Deadline: 5 days
Eppures to build or enough descriptions. And I would advise you completely the project not from the supplier but I have to order. I work to the coordinates of suppliers.
To solve you, the heater and other loads I do and with guarantee.
Freelancehunt
by: @Rekharkiv
by ARTNAME
Artem P.
Winning proposal- Projects -
- Rating -
- Rating 372
Budget: 3200 UAH Deadline: 14 days
Good day ! I will perform the work in a quality and timely manner according to the task.
Proposals are currently absent
-
Daniil Zhuravel 9 March 2018саму стенку Вы планируете из стекла делать или пленкой обтяните ?
если из стекла, то какое Вы думали использовать стекло ?
а что насчет вентиляции? если не планиируется системы приток-вытжка, то рекомендую использовать принцип митлайдера.
"расчет фундамента с учетом наличия винтовых свай 76 диаметра 2000мм длинной"
а сколько штук то в наличии ? -
Andrey Stepanchenko 10 March 2018Хотелось бы уточнить диаметр лепестковой подошвы сваи.
Несущая способность грунта ( в худшем случае) составит 1кг/см.кв. (для глин насыщенных влагой ср. плотности).
Можно было бы определить несущую способность сваи.
Current freelance projects in the category Object Design
It is necessary to design solar stations on a permanent basis - both large and small. Layout of panels, calculation of generation in PV syst, selection of main and electrical equipment (this is preferable).
Furniture for the laundry room
I'm looking for a furniture designer for a small project. I need to develop furniture for a laundry room in a private house. What is needed: to propose practical furniture layout; to consider the placement of the washing and drying machines; to provide storage spaces for household chemicals, a laundry basket, an ironing board, and other items; to prepare drawings or a scheme for manufacturing the furniture. Available: dimensions of the room; an example of how the furniture should approximately look. Experience in designing built-in furniture (kitchens, wardrobes, etc.) will be an advantage. When responding, please send: examples of similar works; an estimated cost; the completion time. If everything goes well, we plan to establish a long-term collaboration.
It is necessary to design a cabinet with two drawers for the bathroom. White color. The drawers should have soft-close mechanisms. We will assemble it ourselves. The cabinet stands on legs.
Develop for two devices: general assembly drawing of the metal frame; general assembly drawing of the service platforms; detailed drawings of ladders; detailed drawings of railings; detailed drawings of equipment supports; specification of metal products; St3 or 09g2s As a result of the design, it is necessary to obtain: 3D model of the frame. General assembly drawing. Specification of metal products. Calculation of the load-bearing capacity of the structure (will be a plus). Description of the device:ParameterValueType of deviceVertical reactor with a stirrerWorking volume2.0 m³Total volumeabout 2.36 m³Body diameterabout 1500 mmHeight of the deviceabout 4265 mmBody materialSteel with enamel coatingType of stirrerAnchorStirrer rotation frequencyabout 85 rpmHeat carrierThermal oil
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.