Serhii B.

Serhii B.

Winning proposal
9 0
  • Projects 9
  • Rating -
  • Rating 795

Budget: 12326 UAH Deadline: 9 days

Hello to you!
Let us collaborate!
Experience as an engineer – 18 years.
AutoCad and Solidworks. Examples of work are in the portfolio.
The last two years are the main field of activity.
Call us, we will help.
The final price and deadlines after familiarization with TZ.

  • Projects -
  • Rating -
  • Rating 416

Budget: 250 UAH Deadline: 1 day

Development of design documentation of different complexity:
• Comprehensive design and equipment of engineering enterprises;
· special technical equipment for the production of rail and car transport;
· equipment for the production of accessory and wire equipment of automotive vehicles;
• Drop and Drop equipment;
• Colour and drying cameras;
• Automated warehouses;
· Technological transportation

Metal construction of buildings and angars (KM and KMD). The

  • Projects 5
  • Rating -
  • Rating 482

Budget: 1000 RUB Deadline: 15 days

Good day, we are doing the KMD in Tekla structures. Experience of 10 years. A large portfolio. Payment is possible both by cash-free calculation under the contract and cash-free pre-payment. I suggest to discuss in detail in personal messages. with respect.

  • Projects -
  • Rating -
  • Rating 201

Budget: 1200 UAH Deadline: 1 day

Calculate all types of loads. Minimum of materials. Minimum amount of work at height. an aircraft engineer.

  • Projects -
  • Rating -
  • Rating 130

Budget: 600 RUB Deadline: 15 days

Good day ,
Ready to work with you. Development of SMDs in Advance Steel and Tekla Structures. Payment for a ton.

  • Projects -
  • Rating -
  • Rating 372

Budget: 1000 UAH Deadline: 1 day

I develop the CMD section in the AutoCAD and Tekla Structures 2016i programs.

  • Projects -
  • Rating -
  • Rating 89

Budget: 40000 UAH Deadline: 25 days

Good Morning, I work on the Tekla program. Experience in performing works of this kind of 8000 square meters.m also performs the layout of sandwich panels and nodes of removal windows, doors...

  • Projects 67
  • Rating 5.0
  • Rating 4 151

Budget: 10000 UAH Deadline: 20 days

Ready to help and if there is a big project, ready to join the team.
KMD, KMM are engaged over 5 years, a young working team.
The prices are very affordable, we are working in 2017.

  • Projects -
  • Rating -
  • Rating 339

Budget: 10000 UAH Deadline: 15 days

Engineer of design. The production of the CMD section and not only. Calculations, estimates and visualization. The drawings are pdf and dwg/

  • Projects -
  • Rating -
  • Rating 47

Budget: 20000 UAH Deadline: 30 days

Hello to you! Engineer of Constructor. Ready to cooperate on a permanent basis.

  • Projects -
  • Rating -
  • Rating 35

Budget: 600 RUB Deadline: 7 days

Good day ! The price is for 1 tonne.
Ready for fruitful cooperation. Experience in calculation, design and construction of metal structures - 7 years.
- Calculation and selection of cuts will be performed in PC LIRA-SAPR 2019 R1 (there is a personal commercial license).
Working documentation will be performed in Tekla Structures 20.0.
The output data will be submitted in .pdf format (if desired in .dwg).

Congratulations to you and your affairs, Alexander!

  • Projects 74
  • Rating 5.0
  • Rating 3 854

Budget: 20000 UAH Deadline: 30 days

Work in the Inventor Program
Experience as a designer 19 years
I have experience in the development of CMD on metal construction

  • Projects 90
  • Rating 5.0
  • Rating 6 145

Budget: 12000 UAH Deadline: 10 days

Good day, ready to discuss and show examples of performance details, I would like to see how you need to design drawings

  • Projects 5
  • Rating -
  • Rating 362

Budget: 200 UAH Deadline: 1 day

Hello to you. I have a lot of experience in designing the CMD. Ready to perform your task in a quality and in a fixed time.

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category Engineering

11 July
10 July
10 July
9 July