The vibration calculation of Solid Works, Ansys.
I put a step on the picture, I put a step on the picture
Value of frequencies in the axis direction: X,U 0.002 g3/Hz; Z 0.003 g3/Hz
The result is a report (word format) from the program with the consistency of the indication of the boundary conditions and the results of the calculation.
The budget is agreed.
Applications 1
-
Доброго дня, Інна!
Для такого типу задач ціна надто мала. Симуляції потребують великої підготовки моделі для якісних результатів, іноді доопрацювання самої моделі. Це великий обсяг роботи.
Чи є у вас можливість підняти бюджет проєкту?
-
Current freelance projects in the category Engineering
Automation bot for playerok.com
89 USD
1. Main Menu and Monitoring Dashboard screen updated in real-time (or by button): Status of key modules (On/Off). Current tasks: number of pending code/email deliveries from buyers, active orders. Financial summary for the current date (Total amount, net profit considering… Engineering, Bot Development ∙ 1 hour 46 minutes back ∙ 18 proposals |
Need an electrical network design engineer in KyivAn electrical network design engineer is needed in Kyiv (specialization: 0.4 kV overhead power lines, DTEK) to complete and support the approval of the finished project — construction of a 0.4 kV overhead line from TP-8461 and a 0.4 kV underground line for a garden house in… Engineering, Object Design ∙ 11 hours 8 minutes back |
Water Supply and Sewerage Design Engineer (WSS, Revit)What is important for us: ✔️ Experience in design for at least 2 years. ✔️ Knowledge of Revit — the main working tool, knowledge of AutoCAD is preferred. ✔️ Modeling fire extinguishing systems in Revit (will be a plus). ✔️ Knowledge of AutoCAD will be a plus. Your main tasks:… Engineering, Drawings & Diagrams ∙ 12 hours 19 minutes back |
PROJECT on External Water Supply and Sewage ZVK and KK
74 USD
It is necessary to develop a working project for sewage and water supply in Kyiv, Obolonsky district. The object is a warehouse. With approval (or without) from Kyivvodokanal. We provide the initial data. Length of sewage 70 linear meters, water supply 140 linear meters (bore… Engineering, Architectural Design ∙ 2 days 7 hours back ∙ 3 proposals |
Development of CAD diagrams for engineering networks of the warehouse and production complex (water supply/sewerage, p
335 USD
Context and Purpose. We are implementing a warehouse-production complex (basement level, L-shaped room ~63×44.6 m, usable area ~2,330 m², 11 functional zones: reception, storage of GP and raw materials, production areas, cutting, assembly, unloading, showrooms, office, auxiliary… Engineering, Drawings & Diagrams ∙ 3 days 2 hours back ∙ 4 proposals |