Processing of Printed Payment
HTTPS://radiodetali.com.ua/ua/product/emkostnaya-knopka-ttp-223-touch-53997
There is no need for light.
Places under the pit should be on the side of the components, without opening.
The thickness of the steel textile is 1 mm (if there is such). The principle scheme must be on the internet.
Size 16x16mm
Color is black
All components must be placed on one side. On the other hand, the sensor with my logo.
These payments should also be ordered in China.
Applications 3
Client's review of cooperation with Oleksii Mihaylov
Processing of Printed PaymentAlexey performed everything timely, quality, at a good price. Easy to understand the task. I consulted. I recommend it. I’m going to get back again!)
Freelancer's review of cooperation with Danilo Galitsky
Processing of Printed PaymentAn adequate and decent customer.
Everything went well.
I recommend cooperation.
-
324 6 1 Good day
1 day
Google Drive
Current freelance projects in the category Engineering
Need an electrical network design engineer in KyivAn electrical network design engineer is needed in Kyiv (specialization: 0.4 kV overhead power lines, DTEK) to complete and support the approval of the finished project — construction of a 0.4 kV overhead line from TP-8461 and a 0.4 kV underground line for a garden house in… Engineering, Object Design ∙ 7 hours 23 minutes back |
Water Supply and Sewerage Design Engineer (WSS, Revit)What is important for us: ✔️ Experience in design for at least 2 years. ✔️ Knowledge of Revit — the main working tool, knowledge of AutoCAD is preferred. ✔️ Modeling fire extinguishing systems in Revit (will be a plus). ✔️ Knowledge of AutoCAD will be a plus. Your main tasks:… Engineering, Drawings & Diagrams ∙ 8 hours 33 minutes back |
PROJECT on External Water Supply and Sewage ZVK and KK
74 USD
It is necessary to develop a working project for sewage and water supply in Kyiv, Obolonsky district. The object is a warehouse. With approval (or without) from Kyivvodokanal. We provide the initial data. Length of sewage 70 linear meters, water supply 140 linear meters (bore… Engineering, Architectural Design ∙ 2 days 4 hours back ∙ 3 proposals |
Development of CAD diagrams for engineering networks of the warehouse and production complex (water supply/sewerage, p
335 USD
Context and Purpose. We are implementing a warehouse-production complex (basement level, L-shaped room ~63×44.6 m, usable area ~2,330 m², 11 functional zones: reception, storage of GP and raw materials, production areas, cutting, assembly, unloading, showrooms, office, auxiliary… Engineering, Drawings & Diagrams ∙ 2 days 22 hours back ∙ 4 proposals |
Calculate the solar field for the Victron inverter
27 USD
There are photos and measurements of a part of the house in one of the adjacent districts of Kyiv. The task is to calculate and place solar panels on suitable roof slopes. (The idea is to create a primitive 3D model with the ability to make corresponding changes quickly). In my… Engineering ∙ 6 days 7 hours back ∙ 3 proposals |
