1. Project goal:
Create a fully functional website with support for both desktop and mobile versions, integrating LP CRM, Google Analytics, and Facebook Pixel. The website of a foreign counterpart will serve as a sample. All content, including banners, photos, and text, will be provided by the client. Upon completion of the work, the website must be uploaded to hosting and the domain must be linked.
2. Functional requirements:
1. Website versions:
- Desktop version.
- Mobile version (responsive or separate).
2. Main sections of the website:
- Home page.
- Product/service pages (if needed).
- Contact page.
- About the company.
- Any other pages analogous to the sample website.
3. Design:
- The website design is similar to the sample of the foreign counterpart, but with the replacement of banners, photos, and texts with those provided by the client.
- The layout must be responsive so that the website displays correctly on any devices (desktop, tablet, mobile phones).
- Integration with external services:
- LP CRM.
- Google Analytics.
- Facebook Pixel.
4. Integrations:
- Integration with LP CRM for processing and managing leads.
- Connection and setup of Google Analytics for tracking traffic and user behavior on the website.
- Installation and configuration of the Facebook pixel for analyzing interactions with ads and tracking conversions.
5. SEO optimization:
- Setting up meta tags for all pages (title, description, keywords).
- Optimizing the website for search engines (Google).
6. Hosting deployment:
- Uploading the website to the hosting provided by the client (hostiq).
- Linking the domain.
- Setting up the SSL certificate to ensure connection security.
7. Content:
- Banners, photos, and texts are provided by the client.
3. Technical requirements:
1. Platform:
- Any platform can be used, the main condition is to meet all requirements.
2. Hosting and domain:
- Access to hosting and domain is provided by the client.
3. Browser compatibility:
- Proper functioning of the website in major browsers: Chrome, Firefox, Safari, Edge.
4. Deadlines:
- Completion time - 3 days
5. Work stages:
1. Discussion and approval of layouts and functionality.
2. Layout and creation of the website.
3. Integration of CRM and analytics.
4. Testing the website on all devices.
5. Uploading the website to hosting, linking the domain.
6. Final check and project handover.
All materials will be provided in personal messages for confidentiality reasons, thank you for your understanding 🙏🏻