The installation of key components of the extrusion head has been carried out, focusing on the verification and adjustment of the mechanism for guiding the molten plastic during the forming process.

Project features:
- Accurate positioning of all elements of the head, including internal inserts, cross, sleeves, etc.
- Control of the tightness of connections, coaxiality of elements, and uniformity of flow.
- The installation was performed considering the working temperatures and pressures characteristic of the extrusion process.
- After assembly, a visual and functional analysis was conducted to ensure uninterrupted material supply and the absence of deformations or pressure losses.

Goal: to ensure the proper functioning of the plastic guiding mechanism inside the head and minimize technical failures during production.
Work details
Added 11 January
108 views
Freelancer
Vitalii Bezsmertnyi
Ukraine Kyiv  5  0

A little busy A little busy
5 Safes completed