Alla K.
Winning proposal- Projects 40
- Rating -
- Rating 592
Budget: 200 UAH Deadline: 1 day
Hello, I will formatting the document according to the original. The price is 100 UAH. Go to turn.
Budget: 200 UAH Deadline: 1 day
Welcome to Vitaly!
I will start now and do it in an hour and a half.
There is experience. Go to turn!
Budget: 200 UAH Deadline: 1 day
Good day .
There is just a free time, ready to do it.
Please call me, I will be happy to cooperate.
Budget: 200 UAH Deadline: 1 day
Good day ! Ready to perform the task within an hour. Go to turn.
Budget: 200 UAH Deadline: 1 day
Hello to you!
Ready to fulfill your task today. I do it quickly and efficiently, please contact me.
Budget: 200 UAH Deadline: 1 day
Hi, ready to formate the document, the work will not be done. I have been working with hard for a long time. With respect, Yuri!
- Projects 7
- Rating -
- Rating 269
Budget: 200 UAH Deadline: 1 day
I can do it quickly and efficiently, I can start right now. We agree on the price. Write, you’ll be happy.
Budget: 200 UAH Deadline: 1 day
Good day !
Ready to fulfill your task.
With respect, Andrei
Budget: 200 UAH Deadline: 1 day
Good day !
I’m going to take it right away, it’s ready soon.
Cost - 200 UAH
Budget: 200 UAH Deadline: 1 day
Hello to you. Ready to carry out the task. Go to turn. I will be happy to cooperate.
- Projects 6
- Rating 5.0
- Rating 570
Budget: 200 UAH Deadline: 1 day
Good day ! Ready to fulfill the task. You will be satisfied with the result! Go to turn!
Proposals concealed
Proposals are currently absent
Current freelance projects in the category Technical Documentation
Output data: Existing building: single-story office building; structural scheme — frame-less brick; external walls thickness 380–640 mm; internal load-bearing walls thickness 380–510 mm; ceilings — precast reinforced concrete hollow-core slabs; foundations — columnar with FBS blocks; approximate dimensions of the building — 40.34 × 28.84 m; building area — about 747 m². Planned: dismantling of the existing rafter system and roof; addition of a second floor with glued laminated timber structures; installation of a new wooden roof structure; reconstruction of the existing building with partial changes in loads on load-bearing structures.Required to perform: Analysis of the provided technical report on the building inspection. Verification calculation of existing foundations, walls, and ceilings for the perception of additional loads from the addition. Development of structural solutions regarding: installation of reinforced belts; strengthening of brick walls; strengthening of foundations (if necessary); ensuring spatial rigidity of the building; nodes for load transfer from glued laminated timber structures to the existing building. Calculation and justification of the adopted solutions. Issuance of a set of drawings for the stages of KB/CM/KZ (depending on the adopted solutions). Consulting support during the development of wooden structures and implementation of the project.Output documentation: Scientific and technical report on the building inspection. Measurement drawings. Architectural solutions for the addition. Preliminary concept of glued laminated timber structures.Requirements for the contractor: availability of a design engineer certificate in terms of ensuring mechanical resistance and stability; experience in the reconstruction of existing buildings; experience in designing the strengthening of brick or stone buildings; preferred experience working with additions of wooden structures or glued laminated timber.Message text for Freelancehunt Good day. We are looking for a designer to participate in the project of reconstructing an existing single-story brick office building with a subsequent addition of a second floor made of glued laminated timber. It is necessary to take on the development of structural solutions regarding: reinforced belts; strengthening of existing brick walls; if necessary — strengthening of foundations; ensuring spatial rigidity of the building; load transfer from new wooden structures to the existing building. A technical inspection of the building and measurement drawings have been completed, which will be provided to the contractor after preliminary discussion of the project. Preferred experience: reconstruction of existing buildings; development of solutions for strengthening stone or brick structures; work with additions or wooden structures. Please include in your response: a brief overview of your experience; examples of similar completed projects; available certificates; estimated budget and timelines for the work. We are ready for long-term cooperation on similar projects.
DO NOT use LLM for writing Task: - writing complex prompts for LLM manually 2000-4000 characters with spaces - working language - English - topic - management - we provide the situation - you write realistic work scenarios that require expertise in the field of management - conduct plagiarism and LLM text checks
I'm looking for a practicing lawyer or attorney. I need a description of one real case from personal experience. What needs to be done: Provide a description of one case, as well as real documents related to the case with confidential information removed (names, addresses, case numbers, amounts replaced with conditional ones). The description should include: • what the task was (to prepare a response, an appeal, a motion, etc.) • what documents were involved in the work • how the search for similar court decisions was conducted in the registers (Unified State Register of Court Decisions and others), what keywords were used, what criteria were used to filter the results, what legal norms were relied upon during the search • what decisions were found, why they were relevant, and how their similarity to the current case was assessed • how the found case law influenced the formation of the action strategy and the preparation of the document The key focus: it is important for us to understand the logic of the search, how a lawyer moves from a specific case to similar judicial decisions in order to build a defense strategy or position.