TECHNICAL TASK
Electricity and low-voltage systems for the prefabricated module (Prefab Cabin)
Project Goal
To develop a modular electrical system for a prefabricated house that can be assembled at the factory and quickly connected on-site using a plug-and-play principle.
The system must be optimized for mass production and quick installation.
1. General Concept
The electrical system should be divided into modules (zones).
Examples of zones:
1. Kitchen
2. Bathroom
3. Bedroom
4. Terrace
5. Sauna
6. Hot tub
7. Technical areaEach zone must have a separate cable harness that connects to the main electrical panel.
2. Main Electrical Panel
Provide for the placement of a central electrical panel, from which all systems are powered.
The panel must contain separate lines for:
lighting
outlets
kitchen equipment
sauna
hot tub / jacuzzi
fireplace
ventilation (HRV / ERV)
audio system
outdoor lighting.
3. Voltage Strategy
The system should be divided into:
Low-voltage network
24Vfor:
LED lighting
decorative lighting
facade lighting
control.
Standard network
120V (American standard)for:
outlets
kitchen appliances
coffee machine
sauna
pumps
household appliances.
4. Prefabrication Logic
The electrical system should be designed for installation on the construction site.
Requirements:
pre-assembled cable harnesses
labeling of all wires
quick-disconnect connectors
minimum work on-siteGoal: complete electrical connection of the house on-site in a matter of hours.
5. Quick-disconnect Connectors
It is necessary to provide for the use of standard connectors.
Examples:
WAGO
Molex
waterproof connectors
quick disconnect terminalsThe system should be as simple as possible for installation.
6. Lighting System
Provide for connections for:
Indoor Lighting
main light
hidden LED lighting with a dimmer.
bathroom lighting
kitchen lighting
bedside light.
Outdoor Lighting
facade lighting
terrace lighting
lighting under the house.
It is preferable to use low-voltage LED systems also at 24V.
7. Control
Provide for control for:
lighting zones
terrace
sauna
hot tub
fireplaceControl should be:
prepared for smart system.
8. Audio System
Provide for cables for:
speakers
amplifier
subwoofer.
The amplifier should be placed in a hidden technical cabinet or furniture module.
9. Power Supply for Technical Equipment
Provide for power supply for:
air exchanger (HRV / ERV)
electric sauna stove (Finnish 3-4kW) or infrared will be decided.
hot tub
pellet stove with automation10. Documentation
The engineer must prepare:
electrical plan
cable harness diagram
specification of connectors
electrical panel diagram
installation instructions for prefabrication preferably in English.
11. Main Goal of the System
The electricity must be:
modular
convenient and quick to install
safe
suitable for mass productionThis project will be used for mass production of prefabricated houses.
12. The project should be executed in a Revit model where all devices will already be placed in their locations.
Applications 1
-
890 16 0 Hello, please send the planning for review.
I indicated the price and deadline only for communication purposes.
-
232 Good day, Volodymyr. The task is very interesting. I have been involved in the design of electrical supply and automation of ventilation systems. In carrying out this project, it will be necessary to master a lot of new information. Therefore, the cost and deadlines are approximate and should be clarified as individual stages are completed.
Current freelance projects in the category Drawings & Diagrams
Drawings for client approval
28 USD
Preparation of technical drawings for client approval before production. Wooden entrance doors. Object Design, Drawings & Diagrams ∙ 53 minutes back ∙ 1 proposal |
Adjustment of the construction intention sketch (private house) up to 500 sq.m. with submission to the Unified State Register of Construction Projects.Hello! I am looking for a certified architect (preferably from Lviv or the region) to adjust the existing project and prepare the "Intent to Build" document package for submitting a notification about the start of construction works (via Diia / DIAM).What is available: A… Architectural Design, Drawings & Diagrams ∙ 4 hours 54 minutes back |
Grill meat shop projectHello! A complete design project is needed for a grill meat shop Task: create a modern, stylish, and functional space with an emphasis on an open kitchen and the cooking process over fire. It is necessary to develop the layout, visualization, select materials, lighting, and… Architectural Design, Drawings & Diagrams ∙ 15 hours 33 minutes back ∙ 8 proposals |
Development of working drawing for a metal canopy for bicycle storageIt is necessary to develop a set of working drawings for the manufacture of a metal structure for a bicycle storage canopy. I already have general drawings and sketches of the structure with the main dimensions. Based on them, it is necessary to prepare drawings that the welder… Engineering, Drawings & Diagrams ∙ 1 day 12 hours back ∙ 7 proposals |
It is necessary to create an image and a drawing of the product.It is necessary to create an image and drawing of a children's microscope https://rozetka.com.ua/ua/498322014/p498322014/. Drawings & Diagrams ∙ 2 days 12 hours back ∙ 4 proposals |