Budget: 780 UAH Deadline: 30 days
Hello, please send the planning for review.
I indicated the price and deadline only for communication purposes.
To develop a modular electrical system for a prefabricated house that can be assembled at the factory and quickly connected on-site using a plug-and-play principle.
The system must be optimized for mass production and quick installation.
The electrical system should be divided into modules (zones).
Examples of zones:
1. Kitchen
2. Bathroom
3. Bedroom
4. Terrace
5. Sauna
6. Hot tub
7. Technical areaEach zone must have a separate cable harness that connects to the main electrical panel.
Provide for the placement of a central electrical panel, from which all systems are powered.
The panel must contain separate lines for:
lighting
outlets
kitchen equipment
sauna
hot tub / jacuzzi
fireplace
ventilation (HRV / ERV)
audio system
outdoor lighting.
The system should be divided into:
24Vfor:
LED lighting
decorative lighting
facade lighting
control.
120V (American standard)for:
outlets
kitchen appliances
coffee machine
sauna
pumps
household appliances.
The electrical system should be designed for installation on the construction site.
Requirements:
pre-assembled cable harnesses
labeling of all wires
quick-disconnect connectors
minimum work on-siteGoal: complete electrical connection of the house on-site in a matter of hours.
It is necessary to provide for the use of standard connectors.
Examples:
WAGO
Molex
waterproof connectors
quick disconnect terminalsThe system should be as simple as possible for installation.
Provide for connections for:
main light
hidden LED lighting with a dimmer.
bathroom lighting
kitchen lighting
bedside light.
facade lighting
terrace lighting
lighting under the house.
It is preferable to use low-voltage LED systems also at 24V.
Provide for control for:
lighting zones
terrace
sauna
hot tub
fireplaceControl should be:
prepared for smart system.
Provide for cables for:
speakers
amplifier
subwoofer.
The amplifier should be placed in a hidden technical cabinet or furniture module.
Provide for power supply for:
air exchanger (HRV / ERV)
electric sauna stove (Finnish 3-4kW) or infrared will be decided.
hot tub
pellet stove with automationThe engineer must prepare:
electrical plan
cable harness diagram
specification of connectors
electrical panel diagram
installation instructions for prefabrication preferably in English.
The electricity must be:
modular
convenient and quick to install
safe
suitable for mass productionThis project will be used for mass production of prefabricated houses.
12. The project should be executed in a Revit model where all devices will already be placed in their locations.
Budget: 780 UAH Deadline: 30 days
Hello, please send the planning for review.
I indicated the price and deadline only for communication purposes.
Budget: 27000 UAH Deadline: 30 days
Good day, Volodymyr. The task is very interesting. I have been involved in the design of electrical supply and automation of ventilation systems. In carrying out this project, it will be necessary to master a lot of new information. Therefore, the cost and deadlines are approximate and should be clarified as individual stages are completed.
Engineering 1 proposal 31 July
Object Design 10 proposals 30 July
Architectural Design 11 proposals 29 July
3D Modeling 15 proposals 29 July
Engineering 6 proposals 27 July