Budget: 2500 UAH Deadline: 2 days
Good day, stretching the project in size with the availability of ready drawings is not difficult, not very clear specification without additional comments
Budget: 2500 UAH Deadline: 2 days
Good day, stretching the project in size with the availability of ready drawings is not difficult, not very clear specification without additional comments
Budget: 2000 UAH Deadline: 2 days
Ready to implement your project. Experience in forest design
Budget: 2000 UAH Deadline: 1 day
Good day . I do the drawing of the stairs in 2D and 3D appearance, arming (and will be visible in 3D). Examples of Porfolios
Budget: 2200 UAH Deadline: 3 days
Good day . I can do in 3D I can in AutoCAD - as you will be more interesting - I will only say that the stairs - the thing is not simple - If there is a clear understanding - what the project has changed in the process of construction - then we will solve your task. turn to
Budget: 2500 UAH Deadline: 3 days
Good day . Prepared for AutoCAD / Revit. Screening and specification of the material. 1 to 3 days to start today.
Budget: 2200 UAH Deadline: 2 days
Good day, I have experience in the design of stairs, please, I will do the work quickly and quality
Budget: 3500 UAH Deadline: 10 days
Good morning I can take your order. It was several times to design the stairs from iron-beton. I will make a plan, cutting, arming scheme and visualization of the finished structure after a tree-shaped. to turn.
Develop for two devices: general assembly drawing of the metal frame; general assembly drawing of the service platforms; detailed drawings of ladders; detailed drawings of railings; detailed drawings of equipment supports; specification of metal products; St3 or 09g2s As a result of the design, it is necessary to obtain: 3D model of the frame. General assembly drawing. Specification of metal products. Calculation of the load-bearing capacity of the structure (will be a plus). Description of the device:ParameterValueType of deviceVertical reactor with a stirrerWorking volume2.0 m³Total volumeabout 2.36 m³Body diameterabout 1500 mmHeight of the deviceabout 4265 mmBody materialSteel with enamel coatingType of stirrerAnchorStirrer rotation frequencyabout 85 rpmHeat carrierThermal oil
Calculate the limit loads for the profiled sheet N92 0.8mm S320GD with a span of 3.0m. + Calculate the deflections. Priority is given to a designer with a certificate + quick deadlines. Initial information will be provided.
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.
It is necessary to make an analysis of the project (drawing) of the advertising installation with a description. Dimensions: Width: up to 2.25 m Height: up to 2 m Depth: up to 1 m
packaging solutions / flexible packaging). It is necessary to develop a prototype of a two-chamber packaging for a food product. Idea: The packaging consists of two separate chambers with different ingredients. Upon strong compression of the packaging, the internal partition should controllably break, after which the contents of the two chambers mix. The user then shakes the packaging and opens it for consumption. Requirements: Develop the packaging design. Select materials and production technology. Create a working prototype. Prepare the packaging for mass production. If necessary, assist in finding a manufacturer. Preferred experience: Flexible packaging (sachet, doypack, flow-pack, etc.). Development of custom packaging solutions. Food products or dietary supplements. Understanding of film welding technologies and creating breakable internal partitions. Example concept — BOOMSHOT packaging (in the photo): two chambers that mix upon compression.